Roads25PB0023

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANSLIDE-TERTIARY ROADS-PAYAO-ILOCOS NORTE ROAD-K0610+100-K0610+132

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANSLIDE-TERTIARY ROADS-PAYAO-ILOCOS NORTE ROAD-K0610+100-K0610+132 is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱5,790,343.08. Status: Past target date (DPWH On-Going). Contractor on record: AY-CA CONST SUPPLY. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱85,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Matalag (Downstream) Flood Mitigation Structures, STA. 33+288 - STA. 34+248, with exceptions, Conner, Apayao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-25-0010863

₱509,667.00 · FY2025

Released to Tigwi National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

10 projects · ₱95.0M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. KARAGAWAN FMR, BRGY. KARAGAWAN,KABUGAO,APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱24.7M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, CONNER- KABUGAO RD- K0593+230-K0593+334

Apayao 1st DEO, Cordillera Administrative Region

2025₱19.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP)- MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING,(EVACUATION CENTER), BARANGAY PUGUIN, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP), BIP-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (DEPED ADMIN BUILDING) KAIHS, LUTTUACAN KABUGAO,APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM UNDER THE DEPED'S BASIC EDUCATION FACILITIES FUND: CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING MUSIMUT NATIONAL HIGH SCHOOL, BARANGAY MUSIMUT, KABUGAO, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM, MULT-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF KALLIAT INTEGRATED SCHOOL MULTI-PURPOSE BUILDING, BARANGAY EKB, KABUGAO, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱4.9M
Reported complete (100% progress, DPWH status On-Going)
View all 10 projects →

4. Implementation

Contract Amount

₱5,790,343.08

Progress

Past target date (DPWH On-Going)

Start Date

June 20, 2025

Target End

September 27, 2025

5. Audit