Buildings and Facilities17DD0220

CONSTRUCTION OF BRGY. HEALTH STATION (BHS) WITH FIXTURES, A.) BRGY. TALISAY, LIPA CITY, BATANGAS B.) BRGY. LUMBANG, LIPA CITY, BATANGAS C.) BRGY. MALAGONLONG, LIPA CITY, BATANGAS

CONSTRUCTION OF BRGY. HEALTH STATION (BHS) WITH FIXTURES, A.) BRGY. TALISAY, LIPA CITY, BATANGAS B.) BRGY. LUMBANG, LIPA CITY, BATANGAS C.) BRGY. MALAGONLONG, LIPA CITY, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱5,969,496.00. Status: Reported complete (DPWH). Contractor on record: V N MENDOZA CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Revetment with Floodwall along Downstream of Ibaan River, Ibaan, Batangas
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0020346

₱409,941.00 · FY2017

Released to Regional Office - IV (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

45 projects · ₱285.5M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITIES AT BARANGAY PLARIDEL, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2022₱28.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PLARIDEL, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱24.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITIES AT BARANGAY SAN LUCAS, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2022₱19.2M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS - CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/ IMPROVEMENT OF DRAINAGE SYSTEM AT PLARIDEL-SAN LUCAS ROAD, LIPA CIT

Batangas 4th DEO, Region IV-A

2019₱14.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY LATAG, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2021₱9.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PLARIDEL NATIONAL HIGH SCHOOL, BRGY. PLARIDEL, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2020₱9.6M
Reported complete (DPWH)
View all 45 projects →

4. Implementation

Contract Amount

₱5,969,496.00

Progress

Reported complete (DPWH)

Start Date

November 20, 2017

Target End

January 3, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.