CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LOWER MALABOG FLOOD CONTROL SYSTEM, BRGY. MALABOG, DARAGA, ALBAY 2ND LD
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LOWER MALABOG FLOOD CONTROL SYSTEM, BRGY. MALABOG, DARAGA, ALBAY 2ND LD is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱38,113,626.17. Status: Reported complete (DPWH). Contractor on record: NFH CONST. Figures trace to dpwh.
Total Contract Cost
