Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+165.00, Uson, Masbate
Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+165.00, Uson, Masbate is a DPWH-tracked public work in USON (MASBATE), MASBATE, Region V. Reported contract value: ₱39,140,952.92. Status: Reported complete (DPWH). Contractor on record: GACT ENT. Figures trace to sumbong.
Total Contract Cost
