GACT ENT is listed as a company organization in Philippine public procurement records on this site, with 77 linked DPWH project(s) totaling about ₱873,417,981.91. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GACT ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 77
- Total value
- ₱873,417,981.91
- Published flags
- 0
- Region
- Masbate 2nd DEO · Region V
Licensed officers (PCAB)
- Irish Chua Tayam · Authorized Managing Officer (PCAB license 36867) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for GACT ENT — not an accusation or finding of wrongdoing.
Score: 82.90 / 100 · Projects in sample: 77 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 71.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 71.2
- lateCompletedProjects
- 17
- onTimeCompletedProjects
- 47
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 71
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 6
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 77
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 77
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 77
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 77
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 65 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD-JUNCTION NATIONAL ROAD TO BARANGAY MANAGANAGA TO BAR23FI0020 · ₱49,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALASUCHE SEAWALL, MILAGROS, MASBATE24FI0045 · ₱48,999,954.70 · mapped
- Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+165.00, Uson, Masbate23FJ0016 · ₱39,140,952.92 · mapped
- Construction of Gaid Flood Control, Sta. 0+796.00 - Sta. 0+937.00, Upstream Left Side, Barangay Gaid, Dimasalang, Masbate23FJ0022 · ₱37,198,373.92 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS SECONDARY ROADS - JCT. TAWAD-BALUD RD. K0065+564 - K0065+800, BALUD, MASBATE23FI0004 · ₱32,707,497.03 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - MASBATE - CATAINGAN - PLACER RD. (S00005MT) K0001+627 - K0001+760, K0001+779 - K0001+855, K0008+382 - K0008+723, MASBATE CITY AND MOBO, MASBATE20FI0027 · ₱29,669,422.34 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - MASBATE - CATAINGAN - PLACER RD (S00005MT) - K0009+101.5 - K0009+502, MOBO, MASBATE25FI0004 · ₱29,597,455.48 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF JUNCTION BARANGAY TAGBON, MUNICIPALITY OF MILAGROS TO BARANGAY CAGAY, MASBATE CITY19FI0047 · ₱28,185,264.50 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF MARCELLA FLOOD CONTROL, STA. 0+000- STA. 0+106, U/S R/S, BRGY. MARCELLA, USON, MASBATE23FJ0017 · ₱25,426,932.67 · mapped
- Rehabilitation/Improvement of Narangasan River Control, Milagros, Masbate22FI0003 · ₱25,080,160.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND /OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES CONSTRUCTION OF ROAD, JUNCTION NATIONAL ROAD, BARANGAY CALUMPANG, MILAG24FI0010 · ₱24,750,000.00 · mapped
- OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD - K0034+500- K0035+00025FJ0002 · ₱24,495,420.74 · mapped
- OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD- K0019+564- K0020+20024FJ0004 · ₱22,328,839.27 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. TAWAD - BALUD ROAD (S00023MT) K0061+199 TO K0065+564, LENGTH = 1.144 LANE KM (0.572 KM), BALUD, MASBATE19FI0019 · ₱21,567,041.79 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG MAINGARAN RIVER II, STA. 0+175 - STA. 0+340, NET LENGTH = 328.00 L.M., MASBATE CITY20FI0028 · ₱19,556,319.84 · mapped
- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BUENAVISTA- KAWAYAN RD- K0053+282- K0053+83022FJ0015 · ₱19,011,163.87 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT. TAWAD - BALUD RD. (S00023MT) K0039+453 - K0039+606, MILAGROS24FI0006 · ₱15,324,085.28 · mapped
- CONCRETING OF BRGY. PINANAAN TO BRGY. JABOYOAN FMR, BRGY. PINANAAN, AROROY, MASBATE, AROROY, MASBATE24FI0067 · ₱14,924,957.60 · mapped
- CONCRETING OF BRGY. ALAS TO SITIO CALUMPANG FMR, BRGY. ALAS, MANDAON, MASBATE24FI0065 · ₱14,924,901.30 · mapped
- CONCRETING OF BRGY. BAAO TO BRGY. CAPSAI FMR, BRGY. BAAO, BALENO, MASBATE24FI0066 · ₱14,924,754.05 · mapped
- OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, MASBATE- CATAINGAN- PLACER RD- K0078+000- K0078+38023FJ0005 · ₱14,699,944.65 · mapped
- OO1: ASSET PRESERVATION PROGRAM- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS- MASBATE- CATAINGAN- PLACER RD- K0025+693- K0025+89524FJ0003 · ₱13,758,405.92 · mapped
- CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - ON SPECIFIC LOCATION ALONG JCT. MILAGROS - BALENO - LAGTA RD (S00016MT) K0039+311 TO K0039+947, LENGTH = 636 L.M. (0.636 KM), MILAGROS, MASBATE19FI0016 · ₱12,723,272.87 · mapped
- CONCRETING OF BRGY. TINACLIPAN TO SITIO BATO FMR, STA.0+926 - STA.1+381, NET LENGTH=0.910 LANE KM. (0.455 KM.), BRGY. TINACLIPAN, MILAGROS, MASBATE21FI0047 · ₱12,437,459.21 · mapped
- CONCRETING OF BRGY. SAN AGUSTIN FMR, STA.0+000 - STA.0+455, NET LENGTH=0.910 LANE KM. (0.455 KM.), BRGY. SAN AGUSTIN, AROROY, MASBATE21FI0046 · ₱12,437,423.37 · mapped
- CONSTRUCTION OF ONE (1) UNIT ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING AT SIMAWA NATIONAL HIGH SCHOOL, USON, MASBATE23FJ0047 · ₱10,616,984.04 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT MARY PERPETUA E. BRIOSO MEM. HIGH SCHOOL, MILAGROS, MASBATE18FI0124 · ₱10,530,580.04 · mapped
- CONSTRUCTION OF ONE (1) UNIT ONE (1) STOREY THREE (3) CLASSROOM SCHOOL BUILDING AT DEL CARMEN NATIONAL HIGH SCHOOL, USON, MASBATE23FJ0049 · ₱10,451,032.54 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT MARY PERPETUA E. BRIOSO MEM. HIGH SCHOOL, MILAGROS, MASBATE18FI0123 · ₱10,401,139.56 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT SERAFIN C. ROSERO MEMORIAL HIGH SCHOOL, MILAGROS, MASBATE18FI0122 · ₱10,395,618.36 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT SERAFIN C. ROSERO MEM. HIGH SCHOOL, MILAGROS, MASBATE18FI0121 · ₱10,227,046.65 · mapped
- CONCRETING OF JUNCTION NATIONAL ROAD TO BRGY. CANOMOY FMR, BRGY. CANOMOY FMR, BRGY. CANOMOY, STA. 3+170 - STA. 3+625, NET LENGTH = 0.520 LANE KM (0.260 KM), MANDAON, MASBATE21FI0042 · ₱9,949,943.01 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD - SITIO LUACAN, BARANGAY PARAISO, STA.2+325 - STA. 2+701, MILAGROS, MASBATE22FI0022 · ₱9,899,982.18 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, JUNCTION NATIONAL ROAD - BARANGAY DOCOL - BAAO ROAD, STA. 0+405 - STA. 0+825, NET LENGTH = 0.840 LANE KM (0.420 KM), BALENO, MASBATE21FI0008 · ₱9,899,948.77 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - JCT. TAWAD - BALUD RD. (S00023MT), K0029+064 - K0029+163, MILAGROS, MASBATE22FI0018 · ₱9,800,000.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT. TAWAD - BALUD RD (S00023MT) K0065+891 - K0066+117, BALUD, MASBATE22FI0032 · ₱9,800,000.00 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - JCT. TAWAD - BALUD RD. (S00023MT), K0028+944 -K0029+064, NET LENGTH = 0.228 LANE KM. (0.114 KM), MILAGROS, MASBATE21FI0025 · ₱9,799,946.82 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JUNCTION NATIONAL ROAD SITIO CALULOD - B.TITONG - UBONGAN DACU SECTION LEADING TO VAR25FI0035 · ₱9,602,412.77 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT MILAGROS NATIONAL HIGH SCHOOL, MILAGROS, MASBATE18FI0120 · ₱9,381,547.34 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT MILAGROS NATIONAL HIGH SCHOOL, MILAGROS, MASBATE18FI0119 · ₱9,277,950.64 · mapped
- ORGANIZATIONAL OUTCOME I: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT. TAWAD - BALUD RD (S00023MT) K0039+606 - K0039+670, MILAGROS,24FI0007 · ₱6,586,365.03 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, JUNCTION NATIONAL ROAD TO BARANGAY BANGAD, STA.0+000 - STA.0+450, MILAGROS, MASBATE20FI0005 · ₱6,583,474.55 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT. TAWAD - BALUD ROAD (S00023MT), K0065+800 - K0065+891, NET LENGTH = 0.218 LANE KM (0.109), BALUD, MASBATE21FI0028 · ₱5,978,064.25 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, JUNCTION NATIONAL ROAD TO SITIO VILLARIN, BRGY. N24FI0042 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BAGUMBAYAN, MASBATE CITY, MASBATE24FI0037 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD. BARANGAY B. TITONG, MASBATE CITY, MASBATE24FI0048 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGE FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF ROAD, JUNCTION NATIONAL ROAD TO BRGY. MAGSALANGUI, MILAGRO24FI0041 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES CONSTRUCTION OF ROAD, BARANGAY BATUHAN, MASBATE CITY, MASBATE24FI0093 · ₱4,949,981.81 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/ FACILITIES - COSNTRUCTION OF ROAD, BARANGAY IBINGAY, MASBATE CITY, MASBATE24FI0056 · ₱4,949,975.99 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT SITIO TUBOD TO SITIO TUGBUNGAN, BRGY. JAMORAWON, MIL24FI0043 · ₱4,949,961.08 · mapped
Equipment & capacity
PCAB license
- License no.
- 36867
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Aug 6, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 36867); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
3 evaluations listed across 3 GPPB CPES releases; average final rating 91.1% over 2 rated projects; 3 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 13, 2025 | DPWH | ₱14,699,631.00 | On-going | 84.1% | — | 39th (rev), p. 75 |
| Sep 7, 2023 | DPWH | ₱14,699,945.00 | Final | 97.4% | 89.2% | 36th, p. 80 |
| Mar 5, 2020 | DPWH | ₱12,723,273.00 | Completed | 94.0% | 93.0% | 37th, p. 41 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →