Flood Control and Drainage23FJ0017

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF MARCELLA FLOOD CONTROL, STA. 0+000- STA. 0+106, U/S R/S, BRGY. MARCELLA, USON, MASBATE

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF MARCELLA FLOOD CONTROL, STA. 0+000- STA. 0+106, U/S R/S, BRGY. MARCELLA, USON, MASBATE is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱25,426,932.67. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: GACT ENT. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱26,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-23-002700 · ₱51,334,000 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱24,873,438 · GACT ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-05-07 → 2025-10-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Masbate

Based on the coordinates published with the DPWH record and NOAH file Masbate.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF MARCELLA FLOOD CONTROL, STA. 0+000- STA. 0+106, U/S R/S, BRGY. MARCELLA, USON, MASBATE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱26,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Marcella Flood Control, Sta. 0+000.00 - Sta. 0+200.00, Upstream Right Side, Barangay Marcella, Uson, Masbate
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-23-002700

₱51,334,000.00 · FY2023

Released to 0000000 Philippine Racing - Commission (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

23FJ0017

₱24,873,438.36 · GACT ENTERPRISES

Award / contract ref: 23FJ0017

Contractor

Not graded

77 projects · ₱873.4M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD-JUNCTION NATIONAL ROAD TO BARANGAY MANAGANAGA TO BAR

Masbate 2nd DEO, Region V

2023₱49.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALASUCHE SEAWALL, MILAGROS, MASBATE

Masbate 2nd DEO, Region V

2024₱49.0M
Reported complete (DPWH)
No sat.

Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+165.00, Uson, Masbate

USON (MASBATE), MASBATE, Region V

2023₱39.1M
Reported complete (DPWH)
No sat.

Construction of Gaid Flood Control, Sta. 0+796.00 - Sta. 0+937.00, Upstream Left Side, Barangay Gaid, Dimasalang, Masbate

DIMASALANG (MASBATE), MASBATE, Region V

2023₱37.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS SECONDARY ROADS - JCT. TAWAD-BALUD RD. K0065+564 - K0065+800, BALUD, MASBATE

Masbate 2nd DEO, Region V

2023₱32.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - MASBATE - CATAINGAN - PLACER RD. (S00005MT) K0001+627 - K0001+760, K0001+779 - K0001+855, K0008+382 - K0008+723, MASBATE CITY AND MOBO, MASBATE

Masbate 2nd DEO, Region V

2020₱29.7M
Reported complete (DPWH)
View all 77 projects →

4. Implementation

Contract Amount

₱25,426,932.67

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

May 12, 2023

Target End

August 2, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateUsonMarcella
Storms whose wind field reached it
Nokaen 2026Koto 2025Fung-Wong 2025Kalmaegi 2025Fengshen 2025
Hazard exposure
Active faultFlood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.