| DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | ₱744.4M | 87% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 138 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE | Flood Control Management Cluster | ₱445.3M | Reported complete | MSB VITUG CONST | 138 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR | Flood Control Management Cluster | ₱438.8M | Reported complete | MSB VITUG CONST | 137 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14B, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | L N R CONST | 185 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 185 | Check in |
| 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURABUD-AN, ABUYOG, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURE CADAC-AN RIVER, BARANGAY PAGSANG-AN, ABUYOG, LEYTE | Region VIII | ₱294.9M | Reported complete | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 240 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/ | Region V | ₱288.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 128 | Check in |
| CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | ₱281.5M | Reported complete | PHILWORKS CONST | 142 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BR | Region V | ₱280.3M | Reported complete | PHILWORKS CONST | 139 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 152 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | G C I CONST AND DEV'T CORP | 151 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 152 | Check in |
| REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | ₱274.3M | 65% reported progress | E M CUERPO INC | 224 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 4+780.00 - STATION 5+480, SECTION 5 PHASE 11, BRGY. STA. CRUZ, TANAUAN, LEYTE | Region VIII | ₱265.3M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 195 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 1+900 - STATION 2+550, SECTION 5 PHASE 9, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱263.4M | Reported complete | WTG CONST | 194 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱241.2M | 90% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 147 | Check in |
| Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines Sur | BAAO (CAMARINES SUR), CAMARINES SUR | ₱241.2M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 147 | Check in |
| CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES AND CHANNELIZATION, FATIMA, DULAG, LEYTE 2ND LD, DULAG, LEYTE | Region VIII | ₱241.2M | Reported complete | EZJONES CONST INC | 215 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MOCONG, BASUD, CAMARINES NORTE, BASUD, C | Region V | ₱240.1M | 93% reported progress | BRENTMIN ROOFING ENT | 161 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BASUD RIVER, BARANGAY MAMPILI, BASUD, CAMARINES N | Region V | ₱240.1M | 93% reported progress | BRENTMIN ROOFING ENT | 161 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 2+550 - STATION 3+180, SECTION 5 PHASE 10, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱239.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 194 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGE | Region V | ₱238.7M | 90% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 167 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGA | Region V | ₱237.4M | 92% reported progress | HGG BUILDERS & SUPPLY | 162 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAET RIVER FLOOD CONTROL STRUCTURE (DOGONGAN SECTION-PACKAGE | Region V | ₱236.4M | Reported complete | E GARCIA CONST CORP FOR E GARCIA CONST | 168 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | ₱236.2M | 20% reported progress | EZJONES CONST INC | 193 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | ₱236.1M | 31% reported progress | EZJONES CONST INC | 179 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH FLOOD CONTROL DIKE, BARANGAY BATAN, | Region V | ₱235.9M | 77% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 94 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱235.7M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 147 | Check in |
| CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCT | Catanduanes DEO | ₱235.3M | 0% reported progress | G C I CONST AND DEV'T CORP | 48 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, DAET RIVER, BARANGAY BIBIRAO, DAE | Region V | ₱235.2M | 95% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 166 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BA | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 165 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, BARANGAY CAHABAAN, | Region V | ₱234.0M | 80% reported progress | HGG BUILDERS & SUPPLY | 166 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAY | Region V | ₱234.0M | 84% reported progress | BRENTMIN ROOFING ENT | 156 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TALISAY RIVER, BARANGAY BINA | Region V | ₱234.0M | 96% reported progress | HGG BUILDERS & SUPPLY | 162 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMAR | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 158 | Check in |
| CLUSTER 1: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A). SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A), BRGY. FATIMA, DULAG, LEYTE | Region VIII | ₱233.5M | Reported complete | EZJONES CONST INC | 215 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 178 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 178 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 178 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | ₱226.2M | Reported complete | EZJONES CONST INC | 197 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY BALUD TO BARANGAY STA. ELENA, TANAUAN, LEYTE, LEYTE 1ST LD | Region VIII | ₱212.2M | 94% reported progress | EZJONES CONST INC | 198 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱207.1M | 27% reported progress | EZJONES CONST INC | 196 | Check in |
| CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱198.7M | Reported complete | A D GONZALES JR CONST | 201 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VI | Region V | ₱198.0M | Reported complete | PARTIDO CONST | 170 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), TACLOBAN CITY, LEYTE | Region VIII | ₱197.5M | 86% reported progress | EZJONES CONST INC | 179 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | ₱195.6M | 40% reported progress | EZJONES CONST INC | 201 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, C | Region V | ₱193.0M | 96% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 55 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC, | Region V | ₱193.0M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 58 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION/IMPROVEMENT OF SEAWALL POBLACION-GOGON, RAPU-RAPU, ALBAY (PHASE 2), RAPU-RAP | Region V | ₱193.0M | 95% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 92 | Check in |
| Construction of San Isidro River Control (Downstream) Package 1, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 120 | Check in |
| Construction of San Isidro River Control (Downstream) Package 2, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 119 | Check in |
| BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LD | Region V | ₱193.0M | Reported complete | WCS CONST INC | 140 | Check in |
| Construction of Road Dike along Hitoma River, Phase I, Barangay Obi, Caramoran, Catanduanes | CARAMORAN (CATANDUANES), CATANDUANES | ₱193.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 56 | Check in |
| Construction of Flood Control Structure, Ligao City, Albay Phase II | CITY OF LIGAO (ALBAY), ALBAY | ₱192.9M | Reported complete | SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL / SISBRO CONST CORP FORMERLY: SISBRO CONST & SUPPLY | 134 | Check in |
| OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOL | Region V | ₱192.9M | 96% reported progress | MAKAPA CORP | 142 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.9M | 0% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 128 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY STA. ELENA (UPSTREAM), TANAUAN, LEYTE | Region VIII | ₱192.9M | 89% reported progress | EZJONES CONST INC | 200 | Check in |
| Construction of Flood Control Structure at Binagasbasan, Barangay Paraiso, San Miguel, Catanduanes | SAN MIGUEL (CATANDUANES), CATANDUANES | ₱192.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 44 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN RIVER, BARANGAY CALINGATNAN - SITIO MINAELI, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.7M | 76% reported progress | HGG BUILDERS & SUPPLY | 128 | Check in |
| Construction of Quinale "A" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, Albay | POLANGUI (ALBAY), ALBAY | ₱192.7M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 148 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINONGTOAN SECTION, TANAUAN, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, GUINGAUAN SECTION, TANAUAN, LEYTE | Region VIII | ₱192.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 203 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION ALONG THE SHORELINES OF BRGY. STO, NIÑO, BARANGAY STA. FE, AND BARANGAY VICTORY, ABUYOG, LEYTE | Region VIII | ₱192.5M | 92% reported progress | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 235 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | ₱192.4M | 85% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 154 | Check in |
| Construction of Pantao Storm Surge Protection along Poblacion, Libon, Albay | ALBAY | ₱192.1M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 163 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF PAJO BAGUIO FLOOD CONTROL STRUCTURE,PAJO BAGUIO, VIRAC, CATANDUANES, VIRAC, C | Region V | ₱192.1M | 94% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 60 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | ₱191.9M | 84% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 104 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (UPSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 47% reported progress | LEDA CONST INC | 193 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (DOWNSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 55% reported progress | LEDA CONST INC | 193 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR | Region VIII | ₱190.9M | 67% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 86 | Check in |
| Construction of Flood Control, Brgy. Belen, Leyte, Leyte | LEYTE (LEYTE), LEYTE | ₱190.9M | Reported complete | EZJONES CONST INC / JGO BUILDERS | 201 | Check in |
| REHABILITATION/IMPROVEMENT OF WARAS RIVER FLOOD CONTROL PROJECT (STA. ELENA-SAN JOSE SECTION) IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | ₱190.1M | Reported complete | E GARCIA CONST CORP FOR E GARCIA CONST | 145 | Check in |
| CONSTRUCTION OF TOLOSA TIDE EMBANKMENT, PHASE 1, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | ₱189.4M | 1% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 204 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ROAD DIKE, BUDIAO, DARAGA, ALBAY (PACKAGE 2), DARAGA, ALBAY ( | Region V | ₱189.2M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 129 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PAC | Region V | ₱189.1M | 16% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 128 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PAC | Region V | ₱189.1M | 6% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 128 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PAC | Region V | ₱189.0M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 128 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY MALINAO, TAFT, EASTERN SAMAR | Region VIII | ₱188.5M | 90% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 105 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG AND BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱187.9M | 82% reported progress | EZJONES CONST INC | 196 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY CABARASAN GUTI, TANAUAN, LEYTE | Region VIII | ₱187.9M | 87% reported progress | EZJONES CONST INC | 197 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER, UPSTREAM, PACKAGE 1, TACLOBAN CITY, LEYTE | Region VIII | ₱187.8M | 76% reported progress | EZJONES CONST INC | 179 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BRGY. BASAG, LIGAO C | Region V | ₱187.6M | 89% reported progress | WCS CONST INC | 133 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. DOMINGO, VIRAC, CATANDUANES, VI | Region V | ₱187.5M | 89% reported progress | HI-TONE CONST | 60 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE 1), SITIO LUGI, | Region V | ₱187.2M | 61% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 160 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, OBI, CARAMORAN, CATANDUANES, CARAM | Region V | ₱187.2M | 76% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 56 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, SITIO TAGBAK, PARAISO, SAN MIGUEL, | Region V | ₱187.2M | 98% reported progress | HI-TONE CONST | 44 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN M | Region V | ₱187.2M | 78% reported progress | HI-TONE CONST | 46 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DIKE, BARANGAY STO. CRISTO, VIRAC, CATANDUANES, | Region V | ₱187.2M | 73% reported progress | HI-TONE CONST | 61 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, PACKAGE 1, BARANGAY GUINGAUAN, TANAUAN, LEYTE | Region VIII | ₱187.2M | 5% reported progress | EZJONES CONST INC | 203 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, DOWNSTREAM OF PONSO STEEL | Region V | ₱187.0M | 97% reported progress | PHILWORKS CONST | 140 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIHA, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱186.9M | 69% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 133 | Check in |
| FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱186.4M | Reported complete | A D GONZALES JR CONST | 200 | Check in |
| CLUSTER 2: 1. CONSTRUCTION OF STORM SURGE: HEIGHTENED ROAD AND TIDE EMNAKMENT, SECTION 6.1, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE: HEIGHTENED ROAD AND TIDE EMBANKMENT, SECTION 6.2, TANAUAN, LEYTE | Region VIII | ₱185.9M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 196 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST./IMPV'T. OF CADAC-AN RIVER FLOOD CONTROL SYSTEM,JUBAN, SORSOGON | Region V | ₱185.2M | Reported complete | MAKAPA CORP | 130 | Check in |
| LEGAZPI CITY URBAN DRAINAGE IMPROVEMENT PROJECT, LEGAZPI CITY COASTAL ROAD WITH JOGGER'S LANE INCLUDING SEAWALL (BAYBAY-SAN ROQUE SECTION) LEGAZPI CITY, ALBAY PROVINCE | Region V | ₱184.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 125 | Check in |
| REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES, BRGY. BUDIAO, DARAGA, ,ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | ₱184.5M | 99% reported progress | ALRO CONST | 129 | Check in |
| REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | ₱181.5M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 144 | Check in |
| REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | ₱181.3M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 145 | Check in |
| REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG YAWA RIVER, BRGY. MALOBAGO, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | ₱179.9M | 93% reported progress | JTC CRUZ CONST CO INC | 128 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, TANAUAN, LEYTE | Region VIII | ₱178.0M | 75% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 200 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR | Region VIII | ₱177.9M | 82% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 143 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MITIGATION STRUCTURE ALONG CULASI RIVER, BARANGAY PAMBUHAN, M | Region V | ₱176.9M | 98% reported progress | BRENTMIN ROOFING ENT | 153 | Check in |
| REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (STA. ELENA-STA. LUCIA SECTION), NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | ₱176.6M | 0% reported progress | PHILWORKS CONST | 146 | Check in |
| REHABILITATION/IMPROVEMENT OF WARAS RIVER FLOOD CONTROL PROJECT, STA. LUCIA-SAN ANTONIO SECTION, NABUA, CAMARINES SUR | Region V | ₱176.4M | Reported complete | G C I CONST AND DEV'T CORP | 148 | Check in |
| Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 12+260 - Sta. 12+308 Right Side, Sta. 11+792 - Sta. 12+848 Left Side, Juban, Sorsogon | JUBAN (SORSOGON), SORSOGON | ₱174.7M | Reported complete | MAKAPA CORP | 133 | Check in |
| Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752.00 - Sta. 24+575.57 Left Side, Sta. 23+806.50 - Sta. 24+357.50 Right Side, Irosin, Sorsogon | IROSIN (SORSOGON), SORSOGON | ₱174.4M | Reported complete | MAKAPA CORP | 138 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | ₱173.7M | Reported complete | TR CONST CORP FOR: TR CONST | 119 | Check in |
| Construction of Basud River Flood Mitigation structure (Package 1), Barangay Lidong, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱173.7M | Reported complete | TR CONST CORP FOR: TR CONST | 119 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE(SEAWALL), BARANGAY SABANG, VINZONS, C | Region V | ₱173.7M | Reported complete | HGG BUILDERS | 163 | Check in |
| REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | ₱173.7M | 92% reported progress | RAMARPLUS INC FORMERLY RAMAR ENT | 135 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NABONTON RIVER, LIGAO CITY, ALBAY | Region V | ₱173.6M | 60% reported progress | MAKAPA CORP | 135 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST.OF FLOOD MITIGATION STRUCTURES ALONG SAN AGUSTIN RIVER,LIBON AL | Region V | ₱171.0M | Reported complete | MAKAPA CORP | 145 | Check in |
| CONSTRUCTION OF BANGON FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY SAN JOSE (PHASE 2), PALO, LEYTE | Region VIII | ₱169.7M | 91% reported progress | EZJONES CONST INC | 193 | Check in |
| CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD DIKE LEADING ALONG BUHI LAKE BARANGAY IGBAC, BUHI, CAMARINES SUR | Camarines Sur 5th DEO | ₱168.9M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 132 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAROBO, LLORENTE, EASTERN SAMAR | Region VIII | ₱168.8M | 91% reported progress | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST | 152 | Check in |
| CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱168.8M | 45% reported progress | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST | 129 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, STA. 4+023.50-STA. 5+547.38(WITH EX | Region V | ₱168.3M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 55 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, TANAUAN, LEYTE | Region VIII | ₱168.2M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 200 | Check in |
| REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG TAGAYTAY RIVER, BRGY. TAGAYTAY-BARIW, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | ₱164.9M | 98% reported progress | STEVEN CONST | 135 | Check in |
| Construction of Flood Control Structure along Mahayahay Creek, Tacloban City, Leyte | TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE | ₱164.0M | Reported complete | EZJONES CONST INC / JB KONSTRUKTURA CO | 188 | Check in |
| REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES, UPSTREAM OF CAMALIG BRIDGE, BRGY. 4 (POB)-QUIRANGAY, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | ₱164.0M | Reported complete | ALRO CONST | 133 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMALBAGAN CREEK, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | ₱163.9M | 61% reported progress | EZJONES CONST INC | 204 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | ₱163.9M | 90% reported progress | AQUALINE CONST CORP FORMERLY: AQUALINE CONST | 179 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONST./IMPV'T. OF PADANG RIVER FLOOD CONTROL SYSTEM,PADANG, LEGAZPI CITY, ALBAY 2ND LD | Region V | ₱163.2M | Reported complete | MAKAPA CORP | 122 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG | Region V | ₱162.1M | Reported complete | BRENTMIN ROOFING ENT | 160 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | ₱161.2M | 86% reported progress | BRENTMIN ROOFING ENT | 165 | Check in |
| CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱160.5M | 96% reported progress | LEDA CONST INC | 193 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF EMBARKADERO FLOOD CONTROL STRUCTURE ALONG BAHAY RIVER, (DOWNSTREAM), PALO, LEYTE | Region VIII | ₱159.6M | 83% reported progress | MAMSAR CONST AND INDUSTRIAL CORP | 192 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PAJO RIVER FLOOD CONTROL, VIRAC, CATANDUANES | Region V | ₱159.3M | Reported complete | HI-TONE CONST | 61 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, LAGO | Region V | ₱159.0M | 64% reported progress | ALRO CONST | 116 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY BATANG, IROSIN, SORSOGON | Region V | ₱158.3M | 61% reported progress | ALRO CONST | 139 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GABAO RIVER, BARANGAY GABAO | Region V | ₱158.3M | 85% reported progress | ALRO CONST | 140 | Check in |
| LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REHABILITATION OF KAMANITOHAN RIVER FLOOD CONTROL DIKE(BRGY. ITBA | Region V | ₱157.1M | Reported complete | ST TIMOTHY CONST CORP | 117 | Check in |
| CLUSTER I: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE; 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), BRGY. FATIMA, DULAG, LEYTE | Region VIII | ₱155.9M | Reported complete | EZJONES CONST INC | 215 | Check in |
| Construction of Flood Mitigation Structure along Calagdo River, Barangay Tuaca, Basud Camarines Norte | BASUD (CAMARINES NORTE), CAMARINES NORTE | ₱154.4M | Reported complete | PARTIDO CONST & SUPPLY | 167 | Check in |
| Construction of Flood Mitigation Structure along Minasag River, Barangay San Lorenzo and Barangay Rizal, Santa Elena, Camarines Norte | SANTA ELENA (CAMARINES NORTE), CAMARINES NORTE | ₱154.4M | Reported complete | HGG BUILDERS & SUPPLY | 218 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABALAWAN CREEK, BRGY. CABALAWAN, TACLOBAN CITY | Region VIII | ₱154.3M | 3% reported progress | EZJONES CONST INC | 181 | Check in |
| Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.5 to 4+866.5), Tacloban City, Leyte | TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE | ₱151.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 186 | Check in |
| CONSTRUCTION OF TACLOBAN CITY MASTER DRAINAGE AND FLOOD CONTROL SYSTEM, TACLOBAN CITY | Tacloban City DEO | ₱150.8M | 91% reported progress | MAMSAR CONST AND INDUSTRIAL CORP | 190 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MAMBALITE, DAET, CAMARIN | Region V | ₱149.8M | 89% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 161 | Check in |
| CONSTRUCTION/IMPROVEMENT OF PADANG RIVER FLOOD CONTROL SYSTEM (COMPLETION OF GAPS), LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICT | Region V | ₱149.7M | Reported complete | MAKAPA CORP | 122 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PAWILI RIVER, BARANGAY FABRICA, BULA, CAMARINES | Camarines Sur 5th DEO | ₱149.6M | 51% reported progress | G C I CONST AND DEV'T CORP | 152 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY PAWA AN | Region V | ₱149.6M | Reported complete | SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL | 116 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER PROTECTION DIKE ALONG BARANGAY MABINIT, LEGAZPI CITY, A | Region V | ₱149.6M | 87% reported progress | HI-TONE CONST | 125 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER PROTECTION DIKE , PHASE 2, BARANGAY BONGA, LEGAZPI CITY | Region V | ₱149.6M | Reported complete | HI-TONE CONST | 126 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SHORE PROTECTION AND SEAWALL ALONG BRGY. CARANAN-BRGY. DALUPA | Region V | ₱149.6M | 88% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 179 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALABAON RIVER FLOOD MITIGATION STRUCTURE, PHASE 1, MANITO, ALBAY | Albay 2nd DEO | ₱149.6M | 85% reported progress | HI-TONE CONST | 114 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER PROTECTION DIKE ALONG BARANGAY MATANAG, LEGAZPI CITY, A | Region V | ₱149.6M | 94% reported progress | HI-TONE CONST | 124 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CADAC-AN RIVER, BARANGAY CAN-APORONG, ABUYOG, LEYTE | Region VIII | ₱149.5M | 65% reported progress | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 236 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY BUENAVISTA, IROSIN, SORS | Region V | ₱149.0M | 93% reported progress | ALRO CONST | 138 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG | Region V | ₱149.0M | 78% reported progress | E GARCIA CONST CORP FOR E GARCIA CONST | 170 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BICOL RIVER FLOOD MITIGATION STR | Region V | ₱148.6M | 99% reported progress | BICOL GOLDROCK CONST CORP | 161 | Check in |
| CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER, BARANGAY STO. DOMINGO SECTION, NABUA, CAMARINES SUR | Camarines Sur 5th DEO | ₱148.5M | Reported complete | G C I CONST AND DEV'T CORP | 153 | Check in |
| CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BICOL RIVER, BARANGAY OMBAO POLPOG SECTION, BULA, CAMARINES SUR | Camarines Sur 5th DEO | ₱148.5M | Reported complete | G C I CONST AND DEV'T CORP | 158 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 5+640 - STATION 6+080, SECTION 5 PHASE 13, BRGY. CALOGCOG, TANAUAN, LEYTE | Region VIII | ₱147.8M | Reported complete | LADY OF ASSUMPTION ENT INC FORMERLY: LADY OF ASSUMPTION ENT | 196 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BICO | Region V | ₱147.6M | 99% reported progress | CENTERWAYS CONST AND DEVELOPMENT INC | 162 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARUSAN RIVER, ABUYOG, LEYTE | Region VIII | ₱147.5M | 37% reported progress | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 235 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MANTUGAWE, BASUD, CAMARINES NORTE, BA | Region V | ₱147.1M | 94% reported progress | BRENTMIN ROOFING ENT | 167 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY LEMON, CAPOOCAN, LEYTE | Region VIII | ₱146.7M | 46% reported progress | PAFJ CONST AND SUPPLY INC | 202 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TUYO, MACARTHUR, LEYTE | Region VIII | ₱146.0M | 37% reported progress | PAFJ CONST AND SUPPLY INC | 225 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, PHASE 1, TANAUAN, LEYTE | Region VIII | ₱145.5M | 95% reported progress | EZJONES CONST INC | 202 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SHORE PROTECTION AND SEAWALL ALONG BRGY. CARANAN-BRGY. ST | Region V | ₱145.3M | 98% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 178 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZ | Region V | ₱144.9M | 89% reported progress | ROAD EDGE TRADING | 170 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG CULASI, BARANGAY PAM | Region V | ₱144.9M | 79% reported progress | ROAD EDGE TRADING | 153 | Check in |
| Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay | CITY OF TABACO (ALBAY), ALBAY | ₱144.8M | Reported complete | SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL | 117 | Check in |
| Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Juban, Sorsogon | SORSOGON | ₱144.8M | Reported complete | MAKAPA CORP | 134 | Check in |
| Construction/Improvement/Rehabilitation of Cadac-an River Flood Mitigation Structure, Irosin, Sorsogon | SORSOGON | ₱144.8M | Reported complete | MAKAPA CORP | 138 | Check in |
| Construction of Canawagan Flood Control (Upstream), Kananga, Leyte | KANANGA (LEYTE), LEYTE | ₱144.8M | Reported complete | LEDA CONST INC | 211 | Check in |
| Construction of Flood Mitigation Structure along Kalakran River, Purok 6 to 8, Barangay Saban, Oas, Albay | OAS (ALBAY), ALBAY | ₱144.8M | Reported complete | RICHMAR CONST | 147 | Check in |
| Construction of Flood Control Structure (Facing Downstream along River Dam Section) Zone 1, Barangay Sta. Cruz, Libon, Albay | LIBON (ALBAY), ALBAY | ₱144.8M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 149 | Check in |
| Construction/Improvement of Kapantaran River Flood Mitigation Structures (Homapon - Imalnod Section), Legazpi City, Albay | ALBAY | ₱144.8M | Reported complete | MAKAPA CORP | 132 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KULASI RIVER (UPSTREAM - DAHAT SECTION) PACKAGE 1, LAGONOY, CAMARINES SUR | Camarines Sur 4th DEO | ₱144.8M | 92% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 119 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Camarines Sur 5th DEO | ₱144.8M | 63% reported progress | JTC CRUZ CONST CO INC | 158 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF QUINALE B RIVER FLOOD MITIGATION STRUCTURE, MALINAO, | Region V | ₱144.8M | Reported complete | MAKAPA CORP | 116 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 3, LAGONOY, CAMARINES SUR | Camarines Sur 4th DEO | ₱144.8M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 116 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGONOY RIVER (DOWNSTREAM-GENORANGAN SECTION) PACKAGE 4, LAGONOY, CAMARINES SUR | Camarines Sur 4th DEO | ₱144.8M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 116 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. SAN RAMON SEC., BULA, CAMSUR | Camarines Sur 5th DEO | ₱144.8M | 63% reported progress | JUSTBILT BUILDERS | 159 | Check in |
| ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW | Albay 3rd DEO | ₱144.8M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 156 | Check in |
| Construction/Improvement/Rehabilitation of Padang River Flood Mitigation Structure (Brgy. Buyuan and Brgy. Padang), Legazpi City, Albay | ALBAY | ₱144.7M | Reported complete | MAKAPA CORP | 122 | Check in |
| ORGANIZATIONAL OUTCOME 2 (OO2): PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ALAWIHAO, DAET, CAMAR | Region V | ₱144.7M | 90% reported progress | EUS CONST | 165 | Check in |
| OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST | Region V | ₱144.7M | 46% reported progress | RAMARPLUS INC FORMERLY RAMAR ENT | 126 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE IV), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 180 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | ₱144.7M | 51% reported progress | EUS CONST | 162 | Check in |
| CONSTRUCTION OF FLOOD CONTROL, BARANGAY MABILO I - MABILO II, LABO, CAMARINES NORTE (PACKAGE 3), BRGY. MABILO I - MABILO II, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | 83% reported progress | CENTERWAYS CONST AND DEVELOPMENT INC | 175 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE II), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 181 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABO RIVER (DOWNSTREAM), BARANGAY MATANLANG, LABO, CAMARINES NORTE (PACKAGE III), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 180 | Check in |
| Construction of Flood Control Structure along Box Culvert, Barangay Lidong, Polangui, Albay | POLANGUI (ALBAY), ALBAY | ₱144.7M | Reported complete | RICHMAR CONST | 136 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 5), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | 74% reported progress | WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS | 179 | Check in |
| Rehabilitation/Reconstruction of Flood Control Structure along Managa-naga River, Bulan, Sorsogon | SORSOGON | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC / L BROS CONST AND SUPPLY INC FORMERLY: L BROS CONST & SUPPLY | 151 | Check in |
| Rehabilitation/Reconstruction of Flood Control Structure along Managa-naga River, Bulan, Sorsogon | SORSOGON | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC / L BROS CONST AND SUPPLY INC FORMERLY: L BROS CONST & SUPPLY | 151 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ZONE 7-INARAN-NASUJE COASTAL ROAD WITH SHORE PROTECTION, BULAN, SORSOGON, | Region V | ₱144.7M | 83% reported progress | WELEX CONST INC FORMERLY WELEX C | 151 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 6), BRGY. MATANLANG, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | 76% reported progress | WAYCON BUILDERS AND CONST SUPPLY CORP FOR:WAYCON BUILDERS | 179 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE II), BRGY. LUGUI, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 176 | Check in |
| Construction of Quinale ''B'' River Flood Mitigation Structure, Malinao, Albay | MALINAO (ALBAY), ALBAY | ₱144.7M | Reported complete | MAKAPA CORP | 115 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER BANK PROTECTION WORKS ALONG BARANGAY NAGOTGOT, MANITO, ALBAY | Albay 2nd DEO | ₱144.7M | 87% reported progress | HI-TONE CONST | 116 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN BRIDGE | Albay 3rd DEO | ₱144.7M | 95% reported progress | RAMARPLUS INC FORMERLY RAMAR ENT | 146 | Check in |
| CONST. OF FLOOD CONTROL ANTIAO BRIDGE IV (CATBALOGAN DIVERSION BRIDGE), SAN ANDRES, CATBALOGAN CITY, SAMAR, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Samar 2nd DEO | ₱144.7M | Reported complete | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST | 137 | Check in |
| CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES AND CHANNELIZATION, BATUG, DULAG, LEYTE | Region VIII | ₱144.7M | Reported complete | EZJONES CONST INC | 216 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATOGDON RIVER, BARANGAY LUGUI, LABO, CAMARINES NORTE (PACKAGE I), BRGY. LUGUI, LABO, CAMARINES NORTE | Camarines Norte DEO | ₱144.7M | Reported complete | CENTERWAYS CONST AND DEVELOPMENT INC | 176 | Check in |
| OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN GUINOBATAN, ALBAY FOR CRITICAL SECTIONS OF | Region V | ₱144.7M | Reported complete | WCS CONST INC | 137 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER, PHASE 2, TACLOBAN CITY | Tacloban City DEO | ₱144.7M | 50% reported progress | JELM CONST CORP | 180 | Check in |