SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL is listed as a company organization in Philippine public procurement records on this site, with 83 linked DPWH project(s) totaling about ₱4,898,555,599.24. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 83
- Total value
- ₱4,898,555,599.24
- Published flags
- 4
- Region
- Albay 1st DEO · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL — not an accusation or finding of wrongdoing.
Score: 91.70 / 100 · Projects in sample: 83 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 88.6/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 88.6
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 72
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 79
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 83
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 83
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.9/100 · Weight: 11%
- projects
- 83
- componentScore
- 98.9
- flagsPerProject
- 0.04
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 83
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 46 of 73 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ESPERANZA-PLACER ROAD LEADING TO PASIAGON BEACH FRONT, BALAY NA BATO AND ESPERANZA SEAPORT, MASBATE, ESPERANZA, MASBATE(3RD LEGISLAT20F00074 · ₱159,225,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY PAWA AN24F00272 · ₱149,574,935.63 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) STA. ELENA - CAPALONGA BY PASS COASTAL ROAD, KO270+760 - KO274+300, CAMARINES NORTE16F00047 · ₱146,233,593.69
- Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay23FA0019 · ₱144,750,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ESPERANZA-PLACER ROAD LEADING TO PASIAGON BEACH FRONT, BALAY NA BATO AND ESPERANZA SEAPORT, MASBATE, ESPERANZA, MASBATE(3RD LEGISLATI21F00088 · ₱135,703,125.00 · mapped
- Construction of Pinagbobong River Control, Barangay Pinagbobong, Tabaco City, Albay23FA0018 · ₱135,100,000.00 · mapped
- CLUSTER 6-CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG KABILUGAN/VELASCO/BATO RIVER BASIN (LAKE BICOL), MATAGBAC, PAWA, BUANG, TABACO CTY AND CONSTRUCTION OF BONGABONG RIVER CONTROL, TABACO CITY, ALBAY24FA0044 · ₱132,835,000.00 · mapped
- REHABILITATION/RESTORATION OF BUYUAN FLOOD CONTROL DIKE (DOWNSTREAM OF SPILLWAY), BUYUAN, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DISTRICT20F00140 · ₱119,988,069.44 · mapped
- CONSTRUCTION OF SAN LORENZO- SALVACION SEAWALL, TABACO CITY, ALBAY24FA0060 · ₱109,045,000.00 · mapped
- Construction of San Lorenzo Seawall (Phase 5), Tabaco City, Albay24FA0017 · ₱104,220,000.00 · mapped
- CONSTRUCTION OF ROAD, COMUNTO OGOB, MALINAO, ALBAY23FA0045 · ₱96,500,000.00 · mapped
- CLUSTER 13-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS; ACCESS ROADS LEADING TO BACACAY SEAPORT, BACACAY, ALBAY AND LEADING TO SAN ROQUE PORT, TABACO CITY, ALBAY 1ST LD17FA0023 · ₱96,040,000.00
- Construction/Extension of Fatima Seawall, Tabaco City, Albay22FA0014 · ₱94,570,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS, DM JCT.-LEGAZPI-STO. DOMINGO-TABACO- CAM. SUR BDRY. ROAD K0579+800-K0579+940, TIWI, ALBAY19FA0011 · ₱94,570,000.00 · mapped
- CONST. OF DPWH-ABAY 1ST DISTRICT ENGINEERING OFFICE, TABACO CITY, ALBAY (MAIN BLDG.) PHASE I25FA0025 · ₱93,605,321.61 · mapped
- CLUSTER 5-CONSTRUCTION/EXTENSION OF PAWA SEAWALL, SAN CARLOS SEAWALL AND SALVACION SEAWALL PHASE III, TABACO CITY, ALBAY20FA0005 · ₱93,417,520.00 · mapped
- CLUSTER 25- CONSTRUCTION/COMPLETION/REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDINGS AT TABACO CITY, ALBAY23FA0081 · ₱93,150,000.00 · mapped
- ROAD WIDENING SECONDARY ROADS ALONG LIGAO-TABACO ROAD K0521+130-K0522+645, K0522+660-K0522+700,K0524+200-K0525+22719FA0012 · ₱88,297,500.00 · mapped
- CLUSTER 9- WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO LANES, BUANG BRIDGE (B00198LZ) AND ROCAMONTE BRIDGE (B00207LZ) ALONG LIGAO-TABACO ROAD, TABACO CITY, ALBAY19FA0029 · ₱87,000,000.00 · mapped
- CLUSTER 23- CONST. AND COMPLETION OF SCHOOL BUILDINGS IN THE ELEMENTARY AND SECONDARY CLASSROOMS ( CY 2018 BEFF-BATCH 1) AT MALINAO AND TIWI, ALBAY18FA0046 · ₱86,794,818.58 · mapped
- CLUSTER 24-CONTINUATION OF THE CONSTRUCTION OF THE SAN VICENTE-SAN CARLOS LINKING ROAD, TABACO CITY AND ROAD OPENING AND CONCRETING OF CALAYUCAY-SAN ROQUE BRGY. ROAD, STO. DOMINGO, ALBAY19FA0046 · ₱79,200,000.00 · mapped
- Construction/ Extension of Seawall, San Roque, Tabaco City, Albay22FA0018 · ₱77,200,000.00 · mapped
- CONSTRUCTION OF MALILIPOT BY-PASS ROAD, MALILIPOT, ALBAY20FA0017 · ₱75,945,500.00 · mapped
- CLUSTER 31-REHAB./RESTORATION/RECONSTRUCTION OF FLOOD CONTROL PROJECTS DAMAGED BY TYPHOON NINA AND SUPER TYPHOON LAWIN, TABACO CITY,ALBAY17FA0058 · ₱74,733,460.00
- CLUSTER 48-REHAB./EXPANSION OF PUBLIC MARKET & PUBLIC CEMETERY IN THE FIRST DISTRICT OF ALBAY19FA0091 · ₱74,625,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- POBLACION-MOROCBOROCAN-GUINHADAP LEADING TO SAN MIGUEL ISLAND DIVE SITE AND LIGHT HOUSE AND OTHER TOURISM AREAS.20FM0033 · ₱73,657,064.96 · mapped
- CLUSTER 8-CONSTRUCTION/EXTENSION OF BARIW SEAWALL, MALINAO,ALBAY AND BACOLOD SEAWALL, TABACO CITY, ALBAY20FA0008 · ₱73,500,000.00 · mapped
- CLUSTER 3-REHABILITATION/CONSTRUCTION/EXTENSION OF BARIW SEAWALL (PHASE II), MALINAO, ALBAY; ORAS AND PINAGBOBONG RIVER CONTROL, TABACO CITY, ALBAY19FA0023 · ₱72,765,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: MALILIPOT BYPASS ROAD, ALBAY22FA0034 · ₱72,375,000.00 · mapped
- CLUSTER 7- CONST./EXTENSION OF SEAWALL AT PAWA AND TAYHI-BACOLOD, TABACO CITY21FA0017 · ₱68,325,600.00 · mapped
- CLUSTER 10-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BACOLOD AND PAWA, TABACO CITY 1ST LD17FA0020 · ₱62,724,322.48 · mapped
- CLUSTER 23- REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL : BARIW, MALINAO AND CORMIDAL, TABACO CITY, ALBAY17FA0043 · ₱58,275,000.00 · mapped
- CLUSTER 35- IMPROVEMENT/CONSTRUCTION OF PORT AT STO. DOMINGO, TIWI AND TABACO CITY, ALBAY18FA0066 · ₱56,615,144.09 · mapped
- PROPOSED MARINA RO V OFFICE BUILDING, GOVERNMENT REGIONAL CENTER, RAWIS, LEGAZPI CITY18F00128 · ₱52,568,016.90 · mapped
- CLUSTER 7-ROAD WIDENING-SECONDARY ROADS ALONG LIGAO-TABACO ROAD K0517+348-K0517+912; AND K0519+565.80-K0519+865,K0519+873.20-K0520+000, TABACO CITY, ALBAY24FA0045 · ₱51,704,800.00 · mapped
- CONSTRUCTION OF 20 CLASSROOMS, SAN JOSE NHS, MALILIPOT, ALBAY16FA0048 · ₱49,513,007.63
- CONSTRUCTION/EXTENSION OF BRGY. AWANG RIVER CONTROL (DOWNSTREAM) ALONG SAN FRANCISCO/TULIW CREEK, MALINAO, ALBAY19FA0002 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: MALILIPOT BY-PASS ROAD, ALBAY24FA0012 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF PINAGBOBONG RIVER CONTROL, TABACO CITY, ALBAY25FA0004 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF MALILIPOT BY-PASS ROAD, MALILIPOT, ALBAY21FA0025 · ₱49,000,000.00 · mapped
- ROAD WIDENING, SECONDARY ROADS, LIGAO-TABACO ROAD-K0517+912-K0519+045, TABACO CITY, ALBAY20FA0012 · ₱49,000,000.00 · mapped
- WIDENING OF PERMANENT BRIDGE TO MORE THAN 2 LANES AT NAGAS BR. 2 (B00247LZ) ALONG DM JCT-LEGAZPI-STO DOMINGO-TABACO-CAM SUR BDRY, TIWI, ALBAY16FA0036 · ₱48,950,676.66 · mapped
- CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS INCLUDING ROW, MT. MAYON PARK ROAD EXTENSION, TABACO CITY17FA0035 · ₱48,510,000.00 · mapped
- CLUSTER 21 CONSTRUCTION OF ROADWAY AND COVERED DRAINAGE CANAL AT TABACO CITY AND STO. DOMINGO ALBAY19FA0041 · ₱47,520,000.00 · mapped
- CONSTRUCTION OF BRGY. 3 SEAWALL, MALILIPOT, ALBAY16FA0010 · ₱46,205,201.02 · mapped
- CLUSTER 20- CONCRETING OF FARM TO MARKET ROADS IN THE FIRST DISTRICT OF ALBAY18FA0041 · ₱45,996,287.45 · mapped
- CLUSTER 21 CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO LANES ALONG LIGAO-TABACO ROADS16FA0052 · ₱45,869,077.71 · mapped
- CONSTRUCTION/EXTENSION OF SAN CARLOS SEAWALL, TABACO CITY, ALBAY21FA0008 · ₱45,374,000.00 · mapped
- IMPROVEMENT/ WIDENING OF NATIONAL ROADS (SECONDARY ROADS) LIGAO-TABACO RD - K0519+081 - K0519+443, K0519+458 - K0519+560, K0519+569 - K0519+595, K0520+000 - K0520+374, K0520+380 - K0520+724, K0520+735 - K0521+12916FA0032 · ₱44,349,789.28 · mapped
- CONSTRUCTION/REHABILITATION OF BRGY. LABNIG RIVER CONTROL ALONG QUINALE RIVER, LABNIG, MALINAO, ALBAY17FA0010 · ₱44,099,929.04 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →