Roads19FA0046

CLUSTER 24-CONTINUATION OF THE CONSTRUCTION OF THE SAN VICENTE-SAN CARLOS LINKING ROAD, TABACO CITY AND ROAD OPENING AND CONCRETING OF CALAYUCAY-SAN ROQUE BRGY. ROAD, STO. DOMINGO, ALBAY

CLUSTER 24-CONTINUATION OF THE CONSTRUCTION OF THE SAN VICENTE-SAN CARLOS LINKING ROAD, TABACO CITY AND ROAD OPENING AND CONCRETING OF CALAYUCAY-SAN ROQUE BRGY. ROAD, STO. DOMINGO, ALBAY is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱79,200,000.00. Status: Reported complete (DPWH). Contractor on record: SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL. Figures trace to dpwh.

Albay 1st DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROXI-19-0019722 · ₱241,576 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19FA0046 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-29 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER 24-CONTINUATION OF THE CONSTRUCTION OF THE SAN VICENTE-SAN CARLOS LINKING ROAD, TABACO CITY AND ROAD OPENING AND CONCRETING OF CALAYUCAY-SAN ROQUE BRGY. ROAD, STO. DOMINGO, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-19-0019722

₱241,576.00 · FY2019

Released to Division of Davao del Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

83 projects · ₱4.9B total · 4 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ESPERANZA-PLACER ROAD LEADING TO PASIAGON BEACH FRONT, BALAY NA BATO AND ESPERANZA SEAPORT, MASBATE, ESPERANZA, MASBATE(3RD LEGISLAT

Region V, Region V

2020₱159.2M
Reported complete (DPWH)

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANGAY PAWA AN

Region V, Region V

2024₱149.6M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) STA. ELENA - CAPALONGA BY PASS COASTAL ROAD, KO270+760 - KO274+300, CAMARINES NORTE

Region V, Region V

2016₱146.2M
Reported complete (DPWH)

Construction of Baranghawon River Control, Barangay Baranghawon, Tabaco City, Albay

CITY OF TABACO (ALBAY), ALBAY, Region V

2023₱144.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ESPERANZA-PLACER ROAD LEADING TO PASIAGON BEACH FRONT, BALAY NA BATO AND ESPERANZA SEAPORT, MASBATE, ESPERANZA, MASBATE(3RD LEGISLATI

Region V, Region V

2021₱135.7M
Reported complete (DPWH)

Construction of Pinagbobong River Control, Barangay Pinagbobong, Tabaco City, Albay

CITY OF TABACO (ALBAY), ALBAY, Region V

2023₱135.1M
Reported complete (DPWH)
View all 83 projects →

4. Implementation

Contract Amount

₱79,200,000.00

Progress

Reported complete (DPWH)

Start Date

August 28, 2019

Target End

August 11, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of TabacoSan Vicente
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →