CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIVERBANK OF MAUG BRIDGE PHASE II (UPSTREAM), BRGY. MAUG, PROSPERIDAD, AGUSAN DEL SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIVERBANK OF MAUG BRIDGE PHASE II (UPSTREAM), BRGY. MAUG, PROSPERIDAD, AGUSAN DEL SUR is a DPWH-tracked public work in Agusan del Sur 1st DEO, Region XIII. Reported contract value: ₱39,199,023.29. Status: Reported complete (DPWH). Contractor on record: ME 3 CONST 31364. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

