Flood Control and Drainage24C00518

BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, BRGY. TIGPALAS, SAN MIGUEL, BULACAN

BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, BRGY. TIGPALAS, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱98,998,346.78. Status: Past target date (DPWH On-Going). Contractor on record: IM CONST CORP. Figures trace to dpwh.

Region III, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

304 projects · ₱10.7B total · 6 flags

4. Implementation

Contract Amount

₱98,998,346.78

Progress

Past target date (DPWH On-Going)

Start Date

June 3, 2024

Target End

April 28, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.