Construction of Caribot Flood Control Structure, Barangay Mudeng, La Paz, Abra
Construction of Caribot Flood Control Structure, Barangay Mudeng, La Paz, Abra is a DPWH-tracked public work in LA PAZ (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱48,997,500.00. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to sumbong.
Total Contract Cost
