CONSTRUCTION OF FLOOD CONTROL STRUCTURE (INCLUDING RECHANNELING) ALONG BOAC RIVER (STA. 4+155-STA.4+445), BOAC, MARINDUQUE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (INCLUDING RECHANNELING) ALONG BOAC RIVER (STA. 4+155-STA.4+445), BOAC, MARINDUQUE is a DPWH-tracked public work in Marinduque DEO, Region IV-B. Reported contract value: ₱46,549,847.38. Status: Reported complete (DPWH). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to dpwh.
Total Contract Cost



