Construction of Flood Control Structure (Drainage System), Phase 2, Barangay Canhidoc, Palo, Leyte
Construction of Flood Control Structure (Drainage System), Phase 2, Barangay Canhidoc, Palo, Leyte is a DPWH-tracked public work in PALO (LEYTE), LEYTE, Region VIII. Reported contract value: ₱29,656,565.85. Status: Reported complete (DPWH). Contractor on record: G O C BUILDERS. Figures trace to sumbong.
Total Contract Cost
