FLOOD CONTROL STRUCTURES/ FACILITIES: CONSTRUCTION OF TAWI-TAWI FLOOD CONTROL SYSTEM, SITIO TAWI-TAWI, BRGY. 3, CAMALIG, ALBAY
FLOOD CONTROL STRUCTURES/FACILITIES: CONSTRUCTION OF TAWI-TAWI FLOOD CONTROL SYSTEM, SITIO TAWI-TAWI, BRGY. 3, CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱37,966,107.36. Status: Reported complete (DPWH). Contractor on record: NUMERICAL GATE CONST. Figures trace to dpwh.
Total Contract Cost
