Water Provision and Storage23DD0307

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATERWORKS SYSTEM, BRGY. BALAGTASIN I, SAN JOSE, BATANGAS

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATERWORKS SYSTEM, BRGY. BALAGTASIN I, SAN JOSE, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱4,801,500.00. Status: Reported complete (DPWH). Contractor on record: 830 BUILDERS. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱6,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Box Culvert, Cultihan Road, Barangay Salaban, San Jose, Batangas
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-23-0019566

₱7,375,688.00 · FY2023

Released to 0000000 University of - Science and Technology of Southern Philippines - Cagayan de Oro Campus (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

167 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT AND SITE FACILITIES, PARK AND PLAZA, POBLACION,

Batangas 4th DEO, Region IV-A

2024₱28.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (AUDITORIUM) INCLUDING SITE DEVELOPMENT AT BRGY. DON LUIS, SAN JOSE, BATANGAS

Batangas 4th DEO, Region IV-A

2020₱28.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF PROVINCIAL ROAD (MAKALINTAL AVENUE), BARANGAYS BANAY

Batangas 4th DEO, Region IV-A

2022₱28.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, BATANGAS-QUEZON RD - K0115 + 587 - K0116 + 000, K0121 + 719 - K0121 +

Batangas 4th DEO, Region IV-A

2025₱28.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF BOX CULVERT, ROAD AND ROAD APPROACHES, DRAINAGE SYSTEM, SLOPE PROTECTION AND RELATED STRUCTURES AT BARANGAYS TUGTUG TO NATUNUAN, SAN JOSE, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱28.1M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION OF PALANCA-BALAGTASIN- PINAGTUNG ULAN PROVINCIAL ROAD AND ANUS-SABANG PROVINCIAL ROAD, SAN JOSE, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱24.7M
Reported complete (DPWH)
View all 167 projects →

4. Implementation

Contract Amount

₱4,801,500.00

Progress

Reported complete (DPWH)

Start Date

August 17, 2023

Target End

October 15, 2023

5. Audit