Rehabilitation of Flood Control Structure along Bislak River, Barangay Cabaruan-Casilian, Bacarra, Ilocos Norte (Phase 2)
Rehabilitation of Flood Control Structure along Bislak River, Barangay Cabaruan-Casilian, Bacarra, Ilocos Norte (Phase 2) is a DPWH-tracked public work in BACARRA (ILOCOS NORTE), ILOCOS NORTE, Region I. Reported contract value: ₱46,039,127.59. Status: Reported complete (DPWH). Contractor on record: BJMJB CONST & SUPPLY. Figures trace to sumbong.
Total Contract Cost
