Flood Control and Drainage20DC0029

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. BILOG-BILOG, TANAUAN CITY

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. BILOG-BILOG, TANAUAN CITY is a DPWH-tracked public work in Batangas 3rd DEO, Region IV-A. Reported contract value: ₱959,884.00. Status: Reported complete (DPWH). Contractor on record: GAWANATO CONST CORP. Figures trace to dpwh.

Batangas 3rd DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱8,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Systems, City of Tanuan, Batangas
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-20-0011316

₱141,681.00 · FY2020

Released to Region I Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

45 projects · ₱381.3M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY CUTANG CAWAYAN, STA. TERESITA, BATANGAS

Batangas 3rd DEO, Region IV-A

2025₱52.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD

Batangas 3rd DEO, Region IV-A

2024₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATON PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, TANAUAN-TALISAY-TAGAYTAY RD

Batangas 3rd DEO, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN LOOC ELEMENTARY SCHOOL, BARANGAY LOOC, BALETE, BATAN

Batangas 3rd DEO, Region IV-A

2024₱19.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM BARANGAY TALISAY, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2023₱19.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY PUSIL, LIPA CITY BATAN

Batangas 4th DEO, Region IV-A

2025₱19.0M
Past target date (DPWH On-Going)
View all 45 projects →

4. Implementation

Contract Amount

₱959,884.00

Progress

Reported complete (DPWH)

Start Date

September 7, 2020

Target End

November 5, 2020

5. Audit