CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), NUING FLOOD CONTROL, JOSE ABAD SANTOS, DAVAO OCCIDENTAL (SECT. A STA. 0 + 293 - STA. 0 + 040, SECT. B STA. 0 + 747.5 - STA. 0 + 700)
CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), NUING FLOOD CONTROL, JOSE ABAD SANTOS, DAVAO OCCIDENTAL (SECT. A STA. 0 + 293 - STA. 0 + 040, SECT. B STA. 0 + 747.5 - STA. 0 + 700) is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱29,106,455.45. Status: Reported complete (DPWH). Contractor on record: ST MATTHEW GEN CONTRACTOR. Figures trace to dpwh.
Total Contract Cost