CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - REHABILITATION OF FLOOD CONTROL SYSTEM ALONG BAÑAG RIVER (LEFT SIDE), DARAGA, ALBAY
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - REHABILITATION OF FLOOD CONTROL SYSTEM ALONG BAÑAG RIVER (LEFT SIDE), DARAGA, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱36,798,131.45. Status: Reported complete (DPWH). Contractor on record: ALRO CONST. Figures trace to dpwh.
Total Contract Cost

