Construction of Slope Protection Structure22CK0107

Construction of Dike/Slope Protection Sacobia-Bamban River, Malonzo Area, Right Bank, U/S of SCTEX Bridge, Bamban, Tarlac

Construction of Dike/Slope Protection Sacobia-Bamban River, Malonzo Area, Right Bank, U/S of SCTEX Bridge, Bamban, Tarlac is a DPWH-tracked public work in BAMBAN (TARLAC), TARLAC, Region III. Reported contract value: ₱96,470,264.10. Status: Reported complete (DPWH). Contractor on record: 11-16 CONST. Figures trace to sumbong.

BAMBAN (TARLAC), TARLAC, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Camiling River, Right Bank, Sawat Section (Package D), Sawat, Camiling, Tarlac
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-22-0013107

₱2,999,000,000.00 · FY2022

Released to Tarlac 2nd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0005156

₱20,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0004759

₱542,182.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002922

₱811,709,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0004769

₱50,540.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0005139

₱71,901.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002779

₱320,000,000.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

244 projects · ₱19.8B total · 8 flags

4. Implementation

Contract Amount

₱96,470,264.10

Progress

Reported complete (DPWH)

Start Date

March 26, 2022

Target End

March 8, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.