Construction of Flood Control Structures along Alemang River (Naic Diversion Bridge), Naic, Cavite
Construction of Flood Control Structures along Alemang River (Naic Diversion Bridge), Naic, Cavite is a DPWH-tracked public work in NAIC (CAVITE), CAVITE, Region IV-A. Reported contract value: ₱32,073,418.52. Status: Reported complete (DPWH). Contractor on record: HAUSLAND CONST. Figures trace to sumbong.
Total Contract Cost
