CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA LUCIA RIVER (ANNEX 8), PANIQUI, TARLAC
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA LUCIA RIVER (ANNEX 8), PANIQUI, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱93,413,159.14. Status: Past target date (DPWH On-Going). Contractor on record: 11-16 CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

