CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER (SEGMENT 31), VICTORIA, TARLAC
CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER (SEGMENT 31), VICTORIA, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱0.00. Status: Ongoing (DPWH-reported) (For Procurement (DPWH-reported)). Contractor on record: Contractor not linked in this database. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
