CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALUDAVID BRIDGE (DOWNSTREAM), BRGY. 10 SAN MIGUEL, SARRAT, ILOCOS NORTE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALUDAVID BRIDGE (DOWNSTREAM), BRGY. 10 SAN MIGUEL, SARRAT, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱19,591,565.30. Status: Reported complete (DPWH). Contractor on record: NORTHLANDER CONST. Figures trace to dpwh.
Total Contract Cost
