CONSTRUCTION OF ROAD ROMANDIER CAMP ANDRES NATIONAL ROAD, SULU 2ND LD, STA.37+513.67 TO STA.37+661.538; STA.39+120.00 TO STA.39+559.53; STA.39+970.00 TO STA.41+465.00 (NET LENGTH: 2,082.40 LN.M.)
CONSTRUCTION OF ROAD ROMANDIER CAMP ANDRES NATIONAL ROAD, SULU 2ND LD, STA.37+513.67 TO STA.37+661.538; STA.39+120.00 TO STA.39+559.53; STA.39+970.00 TO STA.41+465.00 (NET LENGTH: 2,082.40 LN.M.) is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱70,052,305.74. Status: Reported complete (DPWH). Contractor on record: ESR CONST AND DEVELOPMENT CORP FORMERLY: ESR CONST. Figures trace to dpwh.
Total Contract Cost
