Flood Control and Drainage25AA0059

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, (SWIP) SMALL WATER IMPOUNDING PROJECT, BARANGAY CANAAM, VINTAR, ILOCOS NORTE

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, (SWIP) SMALL WATER IMPOUNDING PROJECT, BARANGAY CANAAM, VINTAR, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱28,407,755.35. Status: Past target date (DPWH On-Going). Contractor on record: MARAPAO-EVANGELISTA ARCHITECT ENGINEERS BUILDERS. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bislak River, (SWIP) Small Water Impounding Project, Barangay Canaam, Vintar, Ilocos Norte
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

F

52 projects · ₱335.8M total · 0 flags

4. Implementation

Contract Amount

₱28,407,755.35

Progress

Past target date (DPWH On-Going)

Start Date

April 8, 2025

Target End

August 13, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.