Construction of Flood Control Structure along Maasim River, Sta. 04+800 - Sta. 05+400 , San Ildefonso, Bulacan
Construction of Flood Control Structure along Maasim River, Sta. 04+800 - Sta. 05+400 , San Ildefonso, Bulacan is a DPWH-tracked public work in SAN ILDEFONSO (BULACAN), BULACAN, Region III. Reported contract value: ₱95,051,207.16. Status: Reported complete (DPWH). Contractor on record: FLORDES CONST & TRADING CORP FORMERLY FLO. Figures trace to sumbong.
Total Contract Cost




