Roads21LH0037

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1644+408-K1644+490, MARILOG DISTRICT, DAVAO CITY

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1644+408-K1644+490, MARILOG DISTRICT, DAVAO CITY is a DPWH-tracked public work in Davao City 2nd DEO, Region XI. Reported contract value: ₱11,383,719.33. Status: Reported complete (DPWH). Contractor on record: BOJUS SUN BUILDERS. Figures trace to dpwh.

Davao City 2nd DEO, Region XI
Region: Region XI

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱23,100,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi and Matina Balusong Section, Both Bank, Davao City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Davao City 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

23 projects · ₱303.5M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1663+840-K1663+890, MARILOG DISTRICT, DAVAO CITY

Davao City 2nd DEO, Region XI

2023₱49.0M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1624+071-K1624+129, MARILOG DISTRICT, DAVAO CITY

Davao City 2nd DEO, Region XI

2022₱29.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE REVETMENT ALONG LIPADAS RIVER, ALAMBRE-LOBOGAN SECTION, LOBOGAN, DAVAO CITY

Davao City 2nd DEO, Region XI

2020₱29.4M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1641+100-K1641+179, MARILOG DISTRICT, DAVAO CITY

Davao City 2nd DEO, Region XI

2021₱25.5M
Reported complete (DPWH)
No sat.

CONST. OF THE FF. PROJECTS AT BRGY. CAMANSI, TORIL DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF WATER SUPPLY SYSTEM AT PUROK 3, BRGY. CAMANSI, D.C. (2) CONST. OF WATER SUPPLY SYSTEM AT PUROK 1, BRGY. CAMANSI, D.C. (3) CONST. OF WATER SUPPLY SYSTEM AT PUROK

Davao City 2nd DEO, Region XI

2021₱19.9M
Reported complete (DPWH)
No sat.

CONST. OF THE FOLLOWING PROJECTS AT BRGY. ALAMBRE, TORIL DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF WATER SUPPLY SYSTEM AT PUROK 5, BRGY. ALAMBRE, D.C. (2) CONST. OF ROAD AT BRGY. ALAMBRE, D.C. (3) INST. OF STREET LIGHTINGS AT PUROK 1 TO PUROK 7, BRGY. AL

Davao City 2nd DEO, Region XI

2021₱19.8M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱11,383,719.33

Progress

Reported complete (DPWH)

Start Date

March 29, 2021

Target End

July 6, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.