Buildings and Facilities16CI0051

CONST OF FOUR(4) STOREY SIXTEEN(16) CLASSROOMS SAPANG BIABAS RESSETLEMENT ELEM SCHOOL, MAB. CITY,PAM

CONST OF FOUR(4) STOREY SIXTEEN(16) CLASSROOMS SAPANG BIABAS RESSETLEMENT ELEM SCHOOL, MAB. CITY,PAM is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱26,431,146.35. Status: Reported complete (DPWH). Contractor on record: AL-B DEVELOPMENT CORP 11740. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

GAA FY2016 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 11740

57 projects · ₱1.3B total · 0 flags

Other projects by this contractor

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ABACAN RIVER, BARANGAY SAPALIBUTAD, ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱96.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOF MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN ANGELES CITY, PAMPANGA (PHASE I)

Pampanga 3rd DEO, Region III

2024₱62.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL PROGRAM; CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES;ANGELES CITY TOLL EXIT CONNECTING NLEX AND SCTEX IN SUPPORT OF HANDICRAFT, FURNITURE,MANUFACTURING,HOTEL, IT-IBPM GARMENTS AND TEXTILES IND

Pampanga 3rd DEO, Region III

2020₱57.9M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM; ROAD WIDENING SECONDARY ROADS; FRIENDSHIP CIRCUMFERENTIAL ROAD (WEST CIRCUM ROAD) INCLUDING ROW K0082+282 - K0084+400, K0086+589 - K0086+595, K0087+781 - K0088+086, K0088+327 - K0088+460, K0089+187 - K0089+589, A.C., PAMP.

Pampanga 3rd DEO, Region III

2018₱54.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE;FLOOD CONTROL STRUCTURES/FACILITIES: CONSTRUCTION OF SLOPE PROTECTION WORKS WITH CONCRETE PAVEMENT ALONG ABACAN RIVER STA. 2+300 TO STA 2+852, ANGELES CITY,PAMPANGA

Pampanga 3rd DEO, Region III

2020₱49.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE;FLOOD CONTROL STRUCTURES/FACILITIES;CONST OF REINFORCED CONCRETE SLOPE PROTECTION ALONG SAPANGBALEN CREEK,MABALACAT CITY,PAMPANGA

Pampanga 3rd DEO, Region III

2019₱49.0M
Reported complete (DPWH)
View all 57 projects →

4. Implementation

Contract Amount

₱26,431,146.35

Progress

Reported complete (DPWH)

Start Date

July 8, 2016

Target End

March 19, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.