Construction of Flood Control Concrete Revetment at Dapdap River, Upstream Right Side, Barangay Dapdap, Sta. 0+000.00 - Sta. 0+247.00, Uson, Masbate
Construction of Flood Control Concrete Revetment at Dapdap River, Upstream Right Side, Barangay Dapdap, Sta. 0+000.00 - Sta. 0+247.00, Uson, Masbate is a DPWH-tracked public work in USON (MASBATE), MASBATE, Region V. Reported contract value: ₱38,730,805.32. Status: Reported complete (DPWH). Contractor on record: RED DIAMOND CONST AND SUPPLY CORP FORMERLY: RED DIAMOND CONST. Figures trace to sumbong.
Total Contract Cost
