CLUSTER 2017RWCS-01 CONSTRUCTION OF RAINWATER COLLECTION SYSTEM: A) TIBAG E/S, TIBAG, ABRA DE ILOG, B) WAWA E/S, WAWA, ABRA DE ILOG, C) LAGO M/S, BALAO, ABRA DE ILOG, D) MATABANG-URILAN M/S, MATABANG, ABRA DE ILOG, E) CABACAO NHS, CABACAO, ABRA DE ILOG, F
CLUSTER 2017RWCS-01 CONSTRUCTION OF RAINWATER COLLECTION SYSTEM: A) TIBAG E/S, TIBAG, ABRA DE ILOG, B) WAWA E/S, WAWA, ABRA DE ILOG, C) LAGO M/S, BALAO, ABRA DE ILOG, D) MATABANG-URILAN M/S, MATABANG, ABRA DE ILOG, E) CABACAO NHS, CABACAO, ABRA DE ILOG, F is a DPWH-tracked public work in Mindoro Occidental DEO, Region IV-B. Reported contract value: ₱2,849,264.07. Status: Reported complete (DPWH). Contractor on record: F A TORRES CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
