CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE B) AT PUROK 2, BARANGAY MALIS, GUIGUINTO, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE B) AT PUROK 2, BARANGAY MALIS, GUIGUINTO, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱46,457,530.56. Status: Ongoing (DPWH-reported) (Not Yet Started (DPWH-reported)). Contractor on record: SYMS CONST TRADING. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost