SYMS CONST TRADING is listed as a company organization in Philippine public procurement records on this site, with 152 linked DPWH project(s) totaling about ₱6,079,646,763.94. Recorded delivery grade D (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
SYMS CONST TRADING
DRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 152
- Total value
- ₱6,079,646,763.94
- Published flags
- 21
- Region
- Bulacan 1st DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for SYMS CONST TRADING — not an accusation or finding of wrongdoing.
Score: 69.00 / 100 · Projects in sample: 152 · As of Oct 22, 2026 UTC
Grade capped at D (max 69/100; 70.8 before the cap) because 2 projects linked to this contractor are the subject of published reports by official bodies or credible news outlets. These are reports by the sources named below, not findings of this site, and they may be disputed.
Office of the Ombudsman, as reported by mb.com.ph (2026-08-28), reported work reported as not built or not found on contract 25CC0155 — Riverbank protection structure along Balagtas River, Brgy. San Juan (Purok 4):
“The project supposedly started last February 24, 2025 and was declared to be 100% accomplished on May 2, 2025. However, upon inspection, it was non-existent”
Read the source (mb.com.ph)Commission on Audit (fraud audit report), as reported by rappler.com (2025-09-08), reported work reported as not built or not found on contract 25CC0252 — Reinforced concrete river wall, Brgy. Piel (Purok 4):
“No construction was found at the site… Yet, based on records, SYMS Construction Trading has been fully paid as of June 30, 2025.”
Read the source (rappler.com)President Marcos (on-site inspection, Sumbong sa Pangulo report), as reported by abs-cbn.com (2025-08-20), reported work reported as not built or not found on contract 25CC0252 — Reinforced concrete river wall, Brgy. Piel (Purok 4):
“Walang ginawa kahit isang araw hindi nagtrabaho.”
Read the source (abs-cbn.com)
The contractor may respond to these reports: submit a right of reply.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 39.5/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 39.5
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 73
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 129
- pastTargetOngoingProjects
- 56
- undatedCompletedProjectsExcluded
- 13
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 152
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 152
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 96.1/100 · Weight: 11%
- projects
- 152
- componentScore
- 96.1
- flagsPerProject
- 0.13
- publishedV2Flags
- 20
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 152
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 152 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY SAN MIGUEL (SITIO DULONG DIKE), CALUMPIT BULACAN25CC0197 · ₱96,499,968.31 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE A, BARANGAY PEREZ, BULAKAN, BULACAN24CC0602 · ₱96,499,818.42 · mapped
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 1, BARANGAY PRITIL, GUIGUINTO, BULACAN25CC0093 · ₱96,499,198.71 · mapped
- CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 5, BARANGAY MALIS, GUIGUINTO, BULACAN25CC0110 · ₱96,498,593.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER AT BARANGAY SANTO CRISTO-BARANGAY TAAL, PULILAN, BULACAN25CC0195 · ₱96,493,812.80 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT), PUROK 3 TO PUROK 4, BARANGAY MANATAL, PANDI, BULACAN25CC0247 · ₱96,491,781.81 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE A, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN24CC0605 · ₱96,345,228.16 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK 5, BARANGAY BUNSURAN, PANDI, BULACAN25CC0299 · ₱92,868,134.74 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE RIVER WALL ALONG BALAGTAS RIVER, PUROK 1, BARANGAY DALIG, BALAGTAS, BULACAN25CC0246 · ₱92,844,782.50 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN24CC0606 · ₱92,830,143.67 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACAN24CC0592 · ₱92,818,653.02 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACAN24CC0588 · ₱92,815,501.81 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK 1, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN25CC0301 · ₱92,795,609.32 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY BULUSAN (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN25CC0091 · ₱92,736,595.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER AT BARANGAY TAAL, PULILAN, BULACAN25CC0196 · ₱92,710,206.94 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT), PUROK 1 TO PUROK 2, BARANGAY SAN ROQUE, BALIUAG, BULACAN25CC0251 · ₱92,688,858.48 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK 3, BARANGAY BULIHAN, PLARIDEL, BULACAN25CC0300 · ₱92,649,204.31 · mapped
- ROAD REHABILITATION OF OPLE ROAD LEADING TO BARASOAIN CHURCH, CITY OF MALOLOS AND PAOMBONG SECTION, CITY OF MALOLOS AND PAOMBONG, BULACAN24CC0492 · ₱92,639,100.65 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK 1, BARANGAY BULIHAN, PLARIDEL, BULACAN25CC0249 · ₱92,634,061.12 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE A) AT PUROK 2, BARANGAY MALIS, GUIGUINTO, BULACAN25CC0245 · ₱92,592,502.08 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACAN24CC0604 · ₱92,585,187.67 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PRITIL (PUROK 2), GUIGUINTO, BULACAN25CC0095 · ₱82,024,448.54 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PRITIL (SITIO KABILANG BAKOOD), GUIGUINTO, BULACAN25CC0094 · ₱82,024,432.57 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN ROQUE (PUROK 2), BALIUAG, BULACAN25CC0054 · ₱77,199,920.13 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAMBOG RIVER, BARANGAY MATIMBO (PUROK BAOG), MALOLOS CITY, BULACAN24CC0649 · ₱77,199,885.93 · mapped
- Construction of Reinforced Concrete Flood Control Structure along Angat River, San Pedro Section, Bustos, Bulacan24CC0370 · ₱77,199,087.48 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BUGUION (PUROK 6 TO PUROK 7), CALUMPIT, BULACAN24CC0187 · ₱77,198,377.80 · mapped
- CONSTRUCTION OF CLASSROOM BUILDING AT ENGR. VIRGILIO V. DIONISIO MEMORIAL HIGH SCHOOL, PULILAN, BULACAN25CC0435 · ₱74,742,100.85 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, BARANGAY PALAPAT (PUROK 6 TO PUROK 7), HAGONOY, BULACAN24CC0664 · ₱74,681,195.86 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY BULIHAN (SITIO PULO), CITY OF MALOLOS, BULACAN25CC0074 · ₱74,268,446.56 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY BULUSAN, CALUMPIT, BULACAN25CC0072 · ₱74,266,427.73 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MANATAL (PUROK 1), PANDI, BULACAN24CC0645 · ₱74,173,674.77 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY DAUNGAN (PUROK 1 TO PUROK 3), GUIGUINTO, BULACAN24CC0637 · ₱74,112,343.62 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BALAGTAS RIVER, BARANGAY SAN JUAN (PUROK 4), BALAGTAS, BULACAN25CC0155 · ₱74,111,867.46 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN ROQUE (PUROK 3), BALIUAG, BULACAN25CC0063 · ₱74,111,863.70 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MALIS (PUROK 4 TO PUROK 5), GUIGUINTO, BULACAN24CC0669 · ₱74,109,809.71 · mapped
- CONSTRUCTION OF CLASSROOM BUILDING AT BALATONG A ELEMENTARY SCHOOL, BRGY. BALATONG A, PULILAN, BULACAN25CC0478 · ₱73,170,383.32 · mapped
- Construction of Reinforced Concrete Flood Control Structure, Barangay Atlag, Malolos City, Bulacan24CC0264 · ₱72,374,953.65 · mapped
- Construction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan24CC0261 · ₱72,374,895.37 · mapped
- Construction of Reinforced Concrete Flood Control Structure, Barangay Caliligawan, Malolos City, Bulacan24CC0394 · ₱72,366,243.51 · mapped
- CONSTRUCTION O FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, PACAKGE A, BARANGAY SAN MIGUEL-BARANGAY MEYSULAO, CALUMPIT, BULACAN24CC0594 · ₱72,363,555.11 · mapped
- CONSTRUCTION OF REVETMENT AT BARANGAY LONGOS, CITY OF MALOLOS, BULACAN24CC0494 · ₱69,876,969.49 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL AT BARANGAY ABULALAS (PUROK 5-PUROK 6), HAGONOY, BULACAN25CC0070 · ₱69,653,907.05 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOLOS RIVER AT PARALUMAN, BARANGAY CANIOGAN, MALOLOS CITY, BULACAN24CC0662 · ₱69,606,979.11 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL AT BARANGAY PUGAD, HAGONOY, BULACAN24CC0656 · ₱69,456,616.66 · mapped
- Construction of Reinforced Concrete Flood Control Structure, Barangay Sagrada Familia (Purok 4 to Purok 5), Hagonoy, Bulacan24CC0192 · ₱67,549,901.28 · mapped
- Construction of Reinforced Concrete Flood Control Structure, Barangay Santa Monica (Purok 6 to Purok 7), Hagonoy, Bulacan24CC0195 · ₱67,549,830.35 · mapped
- Construction of Reinforced Concrete Slope Revetment at Barangay Tikay, Malolos City, Bulacan24CC0199 · ₱67,549,811.86 · mapped
- REHABILITATION OF MALOLOS-PAOMBONG-HAGONOY-CALUMPIT INTERJURISDICTIONAL ROADS, CALUMPIT, BULACAN24CC0535 · ₱67,542,200.53 · mapped
- Construction of Reinforced Concrete Slope Revetment at Barangay Bulihan, Malolos City, Bulacan24CC0198 · ₱62,724,643.44 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
