CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY DAUNGAN (PUROK 1 TO PUROK 3), GUIGUINTO, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY DAUNGAN (PUROK 1 TO PUROK 3), GUIGUINTO, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱74,112,343.62. Status: Past target date (DPWH On-Going). Contractor on record: SYMS CONST TRADING. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

