CONST./MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM REHAB/ IMPV'T OF PAMPANGA RIVER CONTROL PHASE II,STA. 0+119.40- STA. 0+238.75, IBABAO- BANA SECTION,BRGY. IBABAO-BANA, CABANATUAN CITY,NUEVA ECIJA
CONST./MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM REHAB/IMPV'T OF PAMPANGA RIVER CONTROL PHASE II,STA. 0+119.40- STA. 0+238.75, IBABAO- BANA SECTION,BRGY. IBABAO-BANA, CABANATUAN CITY,NUEVA ECIJA is a DPWH-tracked public work in Nueva Ecija 2nd DEO, Region III. Reported contract value: ₱18,561,039.48. Status: Reported complete (DPWH). Contractor on record: L M G CONST INC FORMERLY: LMG CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
