Construction of Slope Protection at Maislap Creek (Southville 8C Phase 1 and Southville 8B Phase 5), Barangay San Isidro, Rodriguez, Rizal
Construction of Slope Protection at Maislap Creek (Southville 8C Phase 1 and Southville 8B Phase 5), Barangay San Isidro, Rodriguez, Rizal is a DPWH-tracked public work in RIZAL, Region IV-A. Reported contract value: ₱9,900,000.00. Status: Reported complete (DPWH). Contractor on record: L EUSEBIO ACE DEVELOPMENT CORP. Figures trace to sumbong.
Total Contract Cost
