Flood Control and Drainage24DN0157

CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN SITIO UPPER KILINGAN PHASE 3, BARANGAY SAN JOSE ANTIPOLO CITY (SECOND DISTRICT)

CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN SITIO UPPER KILINGAN PHASE 3, BARANGAY SAN JOSE ANTIPOLO CITY (SECOND DISTRICT) is a DPWH-tracked public work in Rizal 1st DEO, Region IV-A. Reported contract value: ₱29,399,999.64. Status: Past target date (DPWH On-Going). Contractor on record: L EUSEBIO ACE DEVELOPMENT CORP. Figures trace to dpwh.

Rizal 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱30,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱28,517,739 · L EUSEBIO ACE DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    92% reported · imagery 2021-12-03 → 2021-12-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Rizal

Based on the coordinates published with the DPWH record and NOAH file Rizal.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN SITIO UPPER KILINGAN PHASE 3, BARANGAY SAN JOSE ANTIPOLO CITY (SECOND DISTRICT)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure in Sitio Upper Kilingan Phase 3, Barangay San Jose, Antipolo City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Rizal 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24DN0157

₱28,517,738.66 · L EUSEBIO ACE DEVELOPMENT CORP

Award / contract ref: 24DN0157

Contractor

C

11 projects · ₱164.2M total · 0 flags

4. Implementation

Contract Amount

₱29,399,999.64

Progress

Past target date (DPWH On-Going)

Start Date

September 26, 2024

Target End

April 23, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalCity of AntipoloSan Jose
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.