Barangay
San Jose
San Jose, City of Antipolo, Rizal, Region IV-A (CALABARZON). Urban. Population 129,351 (2024 POPCEN).
PSGC 0405802008 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to San Jose
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
142 records · ₱3,140,540,066.04
- Preventive Maintenance - Tertiary Roadsmarikina - Infanta Rd - K0036 + 236 - K0036 + 355, K0036 + 355 - K0036 + 966, K0037 + 000 - K0037 + 126, K0037 + 126 - K0037 + 385₱94,540,165.27 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Preventive Maintenance - Tertiary Roadsmarikina - Infanta Rd - K0033 + 269 - K0033 + 837, K0035 + 012 - K0035 + 414, K0035 + 414 - K0035 + 696₱94,485,786.50 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure, Tinapantay River, Phase 7, Barangay San Jose, Antipolo City, Rizal (Second District)₱84,879,559.84 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure, Tinapantay River, Phase Iv, Brgy. San Jose Antipolo City (Second District)₱57,900,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Two - Storey Building (Dpwh Standard Design) of Rizal 1st District Engineering Office, Sitio Cabading, Brgy. Inarawan Antipolo City₱57,795,107.42 · 2019 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure, Tinapantay River, Phase 6, Barangay San Jose, Antipolo City (Second District)₱55,577,052.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
How linked: 142 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱116,348,264.62
- Barangay San Jose, Antipolo City, Rizal₱116,348,264.62 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to San Jose itself. This shows the province figure for Rizal.
70,850 records · ₱157,337,540,777.27
70,828 placed at Rizal level itself; the rest in LGUs under it.
- Rizal₱157,337,540,777.27 · 70,828 awards · high confidence (area of delivery is this province only)
- Batangas, Cavite, Laguna, Quezon, Rizal₱26,970,394.00 · 11 awards · low confidence (area of delivery lists several provinces)
- Batangas, Cavite, Laguna, Marinduque, Oriental Mindoro, Quezon, Rizal, Romblon₱16,791,920.00 · 2 awards · low confidence (area of delivery lists several provinces)
- Quezon, Quirino, Rizal₱6,851,825.13 · 1 awards · low confidence (area of delivery lists several provinces)
- Laguna, Quezon, Rizal₱2,747,549.90 · 2 awards · low confidence (area of delivery lists several provinces)
- Quirino, Rizal₱467,415.00 · 2 awards · low confidence (area of delivery lists several provinces)
How linked: 70,828 by area of delivery is this province only; 22 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to San Jose itself. This shows the city figure for City of Antipolo.
8 records · ₱163,765,442.17
7 placed at City of Antipolo level itself; the rest in LGUs under it.
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱138,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Improvement/Rehabilitation of Road at M. Santos Ext., Barangay San Jose₱10,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Construction of Health Center at Brgy. Calawis, Antipolo City₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance₱4,000,000.00 · 2023 · high confidence (location columns in the DBM release)
- Purchase of Vehicle - Two (2) Units of Mini-Dump Trucks₱3,500,000.00 · 2023 · high confidence (location columns in the DBM release)
- Purchase and Installation of Closed-Circuit Television Surveillance System (Cctv) Procurement of 169 Cctv Cameras (Bullet Type)₱851,760.00 · 2023 · high confidence (location columns in the DBM release)
How linked: 8 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
41 records · ₱839,459,000.00
- Construction of Flood Control Structure, Tinapantay River, Phase 7, Barangay San Jose, Antipolo City, Rizal₱91,150,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Kabisig Creek, Phase 2, Barangay San Jose, Antipolo City, Rizal₱50,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Libis Creek Phase 2, Barangay San Jose, Antipolo City, Rizal₱50,000,000.00 · 2024 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Libis Creek, Phase 3, Barangay San Jose, Antipolo City, Rizal₱50,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Ondoy Creek, Barangay San Jose, Antipolo City, Rizal₱50,000,000.00 · 2024 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Ondoy Creek, Phase 2, Barangay San Jose, Antipolo City, Rizal₱50,000,000.00 · 2025 · medium confidence (GAA line text names the place)
How linked: 41 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor: Alpha & Omega Gen Contractor & Development Corp
- Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor: Alpha & Omega Gen Contractor & Development Corp
- Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Pulang Panyo to Binayoyo (Phase 3), Brgy. San Jose, Antipolo CityContractor: Alpha & Omega Gen Contractor & Development Corp
- Pattern Consistent with Contract SplittingConstruction of Flood Control Structure (Upstream) Phase 4, Sitio Binayoyo, Brgy. Calawis, Antipolo CityContractor: Alpha & Omega Gen Contractor & Development Corp
- High Concurrent Workload for One ContractorAlpha & Omega Gen Contractor & Development CorpContractor: Alpha & Omega Gen Contractor & Development Corp
- Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Sitio Libis Creek, Barangay San Jose, Antipolo CityContractor: Bell Const
Contractors on linked DPWH projects
All 45 contractors on DPWH projects linked to San Jose and the LGUs under it. Click a column to sort.
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for San Jose
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
