CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUPILAC RIVER (PHASE VI), R.T. LIM ZAMBOANGA SIBUGAY
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUPILAC RIVER (PHASE VI), R.T. LIM ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Zamboanga Sibugay 2nd DEO, Region IX. Reported contract value: ₱43,199,141.40. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST. Figures trace to dpwh.
Total Contract Cost



