CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ABRA RIVER (QUIRINO SECTION), QUIRINO, ILOCOS SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ABRA RIVER (QUIRINO SECTION), QUIRINO, ILOCOS SUR is a DPWH-tracked public work in Ilocos Sur 2nd DEO, Region I. Reported contract value: ₱18,625,736.85. Status: Reported complete (DPWH). Contractor on record: ARTHIT CORP. Figures trace to dpwh.
Total Contract Cost
