Flood Control and Drainage25CI0053

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY. PULUNG BULO (TOWN AND COUNTRY), ANGELES CITY, PAMPANGA

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY. PULUNG BULO (TOWN AND COUNTRY), ANGELES CITY, PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱19,190,279.04. Status: Past target date (DPWH On-Going). Contractor on record: R M DELA CRUZ CONST. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Sapangbato River, Margot, Angeles City, Pampanga
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Pampanga 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

42 projects · ₱621.0M total · 0 flags

4. Implementation

Contract Amount

₱19,190,279.04

Progress

Past target date (DPWH On-Going)

Start Date

August 8, 2025

Target End

December 23, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.