Construction of Flood Control along Binahaan River, Barangay Guingauan, Tanauan, Leyte
Construction of Flood Control along Binahaan River, Barangay Guingauan, Tanauan, Leyte is a DPWH-tracked public work in TANAUAN (LEYTE), LEYTE, Region VIII. Reported contract value: ₱96,427,104.08. Status: Reported complete (DPWH). Contractor on record: PABLO S LABASBAS CONST CORP FORMERLY: PABLOS LABASBAS CONST CORP / AICON INDUSTRIES. Figures trace to sumbong.
Total Contract Cost
