Flood Control and Drainage18EI0075

CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GABION REVETMENT, LITTLE TANAUAN RIVER CONTROL, ROXAS, ORIENTAL MINDORO

CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GABION REVETMENT, LITTLE TANAUAN RIVER CONTROL, ROXAS, ORIENTAL MINDORO is a DPWH-tracked public work in Southern Mindoro DEO, Region IV-B. Reported contract value: ₱47,468,803.79. Status: Reported complete (DPWH). Contractor on record: SIXTEEN ENT-CALAPAN BRANCH. Figures trace to dpwh.

Southern Mindoro DEO, Region IV-B
Region: Region IV-B

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Gabion Revetment, Little Tanauan River Control, Roxas, Oriental Mindoro
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-18-0012182

₱40,000.00 · FY2018

Released to Regional Office - IVA (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

76 projects · ₱2.7B total · 0 flags

Other projects by this contractor

No sat.

ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-780)-KO064+(-320); KO064+(-200)-KO064+328; KO064+456-KO064+638; KO064+822-KO066+680; KO066+868-KO069+053; KO069+356-KO071+160; KO071+273-KO072+128; KO072+241-KO072+445; KO072+628-KO073+687; KO073+794-KO074+640,

Region IV-B, Region IV-B

2018₱204.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM- CONST. OF MISSING LINKS/NEW ROADS- BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), ORIENTAL MINDORO

Region IV-B, Region IV-B

2023₱135.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS BULALACAO-SAN JOSE ROAD (BULALACAO SECTION), STA. 0+000-STA. 0+044.60; STA. 0+105.40-STA. 1+302; STA. 0+066.60-STA. 0+105.40, ORIENTAL MINDORO

Region IV-B, Region IV-B

2021₱96.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING OF SECONDARY ROADS, CSR (K0094+160 - K0094+191, K0094+200 - K0096+968), BANSUD, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱96.4M
Reported complete (DPWH)
No sat.

WIDENING OF CALAPAN SOUTH ROAD, SECT. 1-KO085+938-KO086+336; SECT. 2-KO086+657-KO086+846; SECT. 3-KO086+887-KO087+364; SECT. 4-KO087+861-KO088+690; SECT. 5-KO089+171-KO089+764; SECT. 6-KO090+287-KO090+390; SECT. 7-KO090+803-KO091+127; SECT. 8-KO091+578-KO

Southern Mindoro DEO, Region IV-B

2017₱93.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CALAPAN SOUTH ROAD, K0103+632 - K0104+224, K0124+976 - K0126+000, K0127+000 - K0127+400, K0127+560 - K0130+000), BONGABONG, ORIENTAL MINDORO

Southern Mindoro DEO, Region IV-B

2018₱92.4M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱47,468,803.79

Progress

Reported complete (DPWH)

Start Date

March 11, 2018

Target End

March 30, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.