Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan
Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan is a DPWH-tracked public work in GUIGUINTO (BULACAN), BULACAN, Region III. Reported contract value: ₱19,739,693.36. Status: Reported complete (DPWH). Contractor on record: TBB CONST CORP. Figures trace to sumbong.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
