TBB CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 145 linked DPWH project(s) totaling about ₱1,800,327,335.74. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
TBB CONST CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 145
- Total value
- ₱1,800,327,335.74
- Published flags
- 1
- Region
- Bulacan 1st DEO · Region III
Licensed officers (PCAB)
- Ronald Cayetano Cruz · Authorized Managing Officer (PCAB license 37026) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TBB CONST CORP — not an accusation or finding of wrongdoing.
Score: 87.80 / 100 · Projects in sample: 145 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 77/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 77
- lateCompletedProjects
- 18
- onTimeCompletedProjects
- 108
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 139
- pastTargetOngoingProjects
- 13
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 145
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 145
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.8/100 · Weight: 11%
- projects
- 145
- componentScore
- 99.8
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 145
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 143 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE K, BARANGAY TANAWAN, BUSTOS, BULACAN24CC0583 · ₱92,601,025.50 · mapped
- Construction of Reinforced Concrete Flood Control Structure along Angat River, Culianin Section, Plaridel, Bulacan24CC0395 · ₱77,199,805.70 · mapped
- Construction of Riverbank Protection Structure along Angat River, Barangay Banga I, Plaridel, Bulacan24CC0076 · ₱72,373,592.08 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY ABULALAS (PUROK 6), HAGONOY, BULACAN25CC0077 · ₱69,623,039.00 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN JOSE (PUROK 2 TO PUROK 3), CALUMPIT, BULACAN25CC0061 · ₱69,429,991.13 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY FRANCES (SITIO BUKID), CALUMPIT, BULACAN25CC0075 · ₱69,285,418.52 · mapped
- Construction of Flood Control Structure along Angat River (Sta. 0 + 672 - Sta. 1 + 007), San Pedro and Poblacion Section, Bustos and Baliuag, Bulacan22CC0137 · ₱45,073,035.02 · mapped
- REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG ANGAT RIVER LUMANGBAYAN SECTION, PLARIDEL, BULACAN20CC0078 · ₱44,131,025.79 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURES AT MEYTO, CALUMPIT, BULACAN22CC0071 · ₱44,099,724.53 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TAMBUBONG ELEMENTARY SCHOOL), TAMBUBONG, BOCAUE, BULACAN24CC0373 · ₱29,699,805.92 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING FACILITIES IN STA. CRUZ, GUIGUINTO, BULACAN PHASE 224CC0486 · ₱29,699,608.16 · mapped
- CONSTRUCTION (COMPLETION) OF TECHNICAL BUILDING, BULACAN 1ST DEO, DPWH COMPOUND, TIKAY, MALOLOS CITY, BULACAN23CC0170 · ₱29,399,424.35 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY BALAYONG, CITY OF MALOLOS, BULACAN25CC0522 · ₱28,958,886.75 · mapped
- CLUSTER 1 - NINE (9) PROJECTS19GB0186 · ₱26,700,000.00 · mapped
- CLUSTER 2 - NINE (9) PROJECTS19GB0192 · ₱26,700,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DAUNGAN, GUIGUINTO, BULACAN25CC0050 · ₱26,566,647.38 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE (PACKAGE 2), PUROK 1, BARANGAY SANTA CRUZ, GUIGUINTO, BULACAN25CC0039 · ₱24,130,658.67 · mapped
- CONSTRUCTION OF TWO STOREY SIX CLASSROOM - GUIGUINTO CENTRAL SCHOOL, GUIGUINTO, BULACAN20CC0245 · ₱23,528,218.15 · mapped
- Construction of Flood Control Structures along Angat River Sta. 00+760 to Sta. 00+960 Sipat Section, Plaridel, Bulacan22CC0268 · ₱23,521,006.99 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BALIWAG-CANDABA RD. - K0052+(-1570) - K0057+350, BALIUAG, BULACAN22CC0220 · ₱21,069,988.43 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - OLD CAGAYAN VALLEY RD. - K0043+(-855) - K0052+985, BALIUAG, BULACAN22CC0208 · ₱21,067,203.98 · mapped
- CONCRETING OF BRGY. MALIBONG BATA FMR, BRGY. MALIBONG BATA, PANDI, BULACAN20CC0300 · ₱21,014,057.38 · mapped
- CONSTRUCTION OF TWO STOREY SIX CLASSROOM - LOLOMBOY ELEMENTARY SCHOOL, BOCAUE, BULACAN20CC0244 · ₱20,719,430.44 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BONGA MAYOR, BUSTOS, BULACAN23CC0350 · ₱19,799,487.84 · mapped
- CONSTRUCTION OF SANTA CRUZ ROAD, GUIGUINTO, BULACAN21CC0060 · ₱19,789,683.52 · mapped
- Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan24CC0066 · ₱19,739,693.36 · mapped
- CONSTRUCTION (COMPLETION) OF TECHNICAL BUILDING, BULACAN 1ST DEO, DPWH COMPOUND, TIKAY, MALOLOS CITY, BULACAN22CC0320 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA RITA, GUIGUINTO, BULACAN25CC0169 · ₱19,308,863.38 · mapped
- Construction of Slope Protection, Barangay Paltao, Pulilan, Bulacan24CC0406 · ₱19,299,673.25 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY WAKAS, BOCAUE, BULACAN23CC0415 · ₱19,205,782.34 · mapped
- CONSTRUCTION (COMPLETION) OF DPWH BULACAN 1ST DEO BUILDING NO. 2, BRGY. TIKAY, MALOLOS CITY, BULACAN23CC0169 · ₱17,185,638.84 · mapped
- CONCRETING/REHABILITATION OF BRGY. POBLACION FMR, BRGY. POBLACION, GUIGUINTO, BULACAN22CC0305 · ₱14,924,697.61 · mapped
- CONCRETING OF BRGY. PITPITAN FMR, BRGY. PITPITAN, BULAKAN, BULACAN24CC0472 · ₱14,924,411.20 · mapped
- CONCRETING OF BRGY. PUNGO FMR, BRGY. PUNGO, CALUMPIT, BULACAN24CC0479 · ₱14,924,216.50 · mapped
- CONCRETING OF BRGY. CUPANG TO BRGY. BAGONG BARRIO FMR, BRGY. BAGONG BARRIO, PANDI, BULACAN24CC0464 · ₱14,919,069.41 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LOLOMBOY NATIONAL HIGH SCHOOL, BOCAUE, BULACAN23CC0390 · ₱14,849,889.20 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BALITE, CALUMPIT, BULACAN24CC0124 · ₱14,849,415.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. POBLACION, PLARIDEL, BULACAN23CC0448 · ₱14,848,425.58 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MATUNGAO, BULAKAN, BULACAN24CC0221 · ₱14,844,211.79 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. STA. INES, PLARIDEL, BULACAN24CC0222 · ₱14,839,703.59 · mapped
- Rehabilitation of Flood Control Structure along Angat River, Poblacion to Lumang Bayan Section, Plaridel, Bulacan22CC0266 · ₱14,699,511.91 · mapped
- Rehabilitation of Flood Control Structure along Balagtas River (Longos Section), Balagtas, Bulacan22CC0207 · ₱14,699,022.84 · mapped
- REHABILITATION OF ROAD, BARANGAY CALUMPANG, CALUMPIT, BULACAN24CC0116 · ₱14,474,632.12 · mapped
- REHABILITATION OF ROAD BARANGAY BUNGAHAN AND BARANGAY LIGAS, MALOLOS CITY, BULACAN24CC0115 · ₱14,474,583.17 · mapped
- REHABILITATION OF ROAD, BRGY. BULIHAN, PLARIDEL, BULACAN24CC0154 · ₱14,467,201.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY ILANG-ILANG, GUIGUINTO, BULACAN25CC0102 · ₱14,380,114.35 · mapped
- CLUSTER 16 - EIGHT (8) PROJECTS19GB0190 · ₱13,846,000.00 · mapped
- CONCRETING OF PUROK 2 TO PUROK 7, BRGY. GUGO FMR, BRGY. GUGO, CALUMPIT, BULACAN20CC0237 · ₱12,934,961.97 · mapped
- CONSTRUCTION OF TWO STOREY FOUR CLASSROOM - MARCELO H. DEL PILAR MEMORIAL SCHOOL BULAKAN, BULACAN18CC0313 · ₱12,365,717.53 · mapped
- CONCRETING OF BRGY. BAGBAGUIN FMR, BRGY. BAGBAGUIN, PANDI, BULACAN23CC0411 · ₱11,938,810.90 · mapped
Equipment & capacity
PCAB license
- License no.
- 37026
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Sep 20, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 37026); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 92.0% over 2 rated projects; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 10, 2023 | DPWH | ₱4,826,119.00 | Final | 90.8% | 90.8% | 36th, p. 206 |
| Aug 25, 2019 | DPWH | ₱9,810,915.00 | Completed | 93.3% | 93.3% | 40th, p. 300 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 160 awards · ₱1,825,499,117.63
- Municipality of Balagtas, Bulacan Infrastructure: 3 awards · ₱8,014,121.12
- Municipality of Bulakan Bulacan Infrastructure: 1 award · ₱3,498,458.76
- Municipality of Balagtas, Bulacan Goods & services: 1 award · ₱2,967,593.10
- 24CC0672- Repair/ Improvement of Multi-Purpose Fac
- 25CC0522 - Construction of Multi-Purpose Building₱28,958,886.75· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0413 - Construction of Road including Drainage₱4,851,764.52· 2025-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0667-Road Rehabilitation including Constructio
- 25CC0050-Construction of Flood Control Structure,₱26,566,647.38· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0061-Construction of Riverbank Protection Stru₱69,429,991.13· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0075-Construction of Riverbank Protection Stru₱69,285,418.52· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0077-Construction of Riverbank Protection Stru₱69,623,039.00· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC00102-Construction of Multi-Purpose Building (₱14,380,114.35· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0169 - Construction of Multi-Purpose Building,₱19,308,863.38· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0026-Construction of Multi-Purpose Building, B₱9,654,858.20· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0039-Construction of Slope Protection Structur₱24,130,658.67· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0202 - Construction (Completion) of Multi-Purp₱4,850,774.38· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0187 - Construction (Completion) of Multi-Purp₱4,851,520.00· 2025-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 25CC0116 - Rehabilitation of Road, Daang Bakal, Ba
- 25CC0036-Rehabilitation of Road, Barangay Pagala,
- 24CC0583 - Construction of River Wall along Angat₱92,601,025.50· 2024-12-16· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0563-Rainwater Collectors in Public Facilities₱2,835,836.98· 2024-10-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0495 - Construction of Multi-Purpose Building,₱9,690,549.92· 2024-06-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0483 - Construction (Completion) of Multi-Purp₱9,701,994.86· 2024-06-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0486 - Construction (Completion) of Multipurpo₱28,809,540.25· 2024-06-03· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0472 - Concreting of Brgy. Pitpitan FMR, Brgy.₱14,551,507.54· 2024-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0464 - Concreting of Brgy. Cupang to Brgy. Bag₱14,551,830.70· 2024-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0479 - Concreting of Brgy. Pungo FMR, Brgy. Pu₱14,551,045.45· 2024-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 24CC0451 - Repair/Maintenance of Drainage Structur
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →