Flood Control and Drainage21CI0001

FLOOD MANAGEMENT PROGRAM;CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONCRETING OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY CAPAYA, ANGELES CITY,PAMPANGA

FLOOD MANAGEMENT PROGRAM;CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONCRETING OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY CAPAYA, ANGELES CITY,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱39,188,730.13. Status: Reported complete (DPWH). Contractor on record: B P CRUZ BUILDERS AND TRADING. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Slope Protection (Flood Control) along Porac River, Station 0+000 to Station 0+164.53, Barangay Valdez, Floridablanca, Pampanga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Pampanga 3rd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

35 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG); CONSTRUCTION/IMPROVEMENT/REHABILITATION OF MULTIPURPOSE BUILDING IN ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2023₱72.4M
Reported complete (DPWH)
No sat.

Rehabilitation of Existing Dike along Lucung River (San Rafael Section, Right Bank), Sta. 8+585 to Sta. 8+985, Bamban, Tarlac

BAMBAN (TARLAC), TARLAC, Region III

2022₱57.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM; CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY PULUNG MARAGUL, ANGELES CITY, PAMPANGA-STA 1+800-STA 2+550

Pampanga 3rd DEO, Region III

2022₱55.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ZAMBALES NAVAL HOSPITAL, NAVAL STATION LEOVIGILDO GANTIOQUI (NSLG), SAN ANTONIO, ZAMBALES

Zambales 1st DEO, Region III

2022₱49.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM; CONST./REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS; FLOOD CONTROL AND DRAINAGE; DRAINAGE/SLOPE PROTECTION WORKS; CONST. OF SLOPE PROTECTION ALONG QUITANGIL CREEK, BRGY. LA PAZ TO BRGY SAN NICOLAS, MAGALANG,PAMPANGA

Pampanga 3rd DEO, Region III

2021₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM;CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS;REHAB OF SLOPE PTOTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER,BRGY PANDAN TO BRGY CAPAYA, ANGELES CITY PAMPANGA

Pampanga 3rd DEO, Region III

2020₱48.9M
Reported complete (DPWH)
View all 35 projects →

4. Implementation

Contract Amount

₱39,188,730.13

Progress

Reported complete (DPWH)

Start Date

February 9, 2021

Target End

July 8, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.