Flood Control and Drainage23FB0078

BIP: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG LIBOD-SUHA RIVER 9 (PHASE 2), CAMALIG, ALBAY

BIP: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG LIBOD-SUHA RIVER 9 (PHASE 2), CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱19,205,523.32. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: CBC CONST. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Protection (Dike) along Brgy. Pawa - Bogtong (Phase 2), Legazpi City, Albay
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Albay 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

87 projects · ₱1.3B total · 0 flags

4. Implementation

Contract Amount

₱19,205,523.32

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 24, 2023

Target End

June 25, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.