BIP: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG LIBOD-SUHA RIVER 9 (PHASE 2), CAMALIG, ALBAY
BIP: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG LIBOD-SUHA RIVER 9 (PHASE 2), CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱19,205,523.32. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: CBC CONST. Figures trace to dpwh.
Total Contract Cost
