OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0445+190-K0445+205, K0446+630-K0446+730, K0448+550-K0448+560, K
OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0445+190-K0445+205, K0446+630-K0446+730, K0448+550-K0448+560, K is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱7,922,257.77. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: 739 BUILDERS. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

