Construction of Flood Control Structure with Steel Sheet Pile Foundation along Ungot Creek (Package U), Tarlac City, Tarlac
Construction of Flood Control Structure with Steel Sheet Pile Foundation along Ungot Creek (Package U), Tarlac City, Tarlac is a DPWH-tracked public work in CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC, Region III. Reported contract value: ₱96,499,308.66. Status: Reported complete (DPWH). Contractor on record: CHIARA2300 INC / HIGH STRENGTH DEV CORP. Figures trace to sumbong.
Total Contract Cost
